Similar Projects
Lynn Lane Trunk Sewer Replace - S.1609 - Construction
Infrastructure
Conception
$1,874,896 est. value
Broken Arrow, OK 74012

Haikey Creek Trunk Sewer Phase 1 - Construction - HC21010 - City of Broken Arrow
Infrastructure
Conception
$4,090,075 est. value
Broken Arrow, OK 74011

Pavement Rehabilitation
Infrastructure
Design
$22,434,951 CJ est. value
Tulsa, OK 74110

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Non-Arterial Street Rehabilitation/Maintenance Zone 8057
Infrastructure
Bidding
$200,000 CJ est. value
Tulsa, OK 74103

Sheridan Road Booster Pump Station
Infrastructure
Post-Bid
Collinsville, OK 74021

2" Waterline Replacement
Infrastructure
Post-Bid
Tulsa, OK

Sidewalk and Curb Ramp Construction for CBDG / HUD Grant
Infrastructure
Results
$235,173 CJ est. value
Tulsa, OK 74103

CDBG Water Line Replacement
Infrastructure
Results
Sand Springs, OK 74063

Jenks Speech Therapy
New Construction, Infrastructure - 6,080 SF
Construction
$1,300,000 CJ est. value
Jenks, OK 74037

Uncle Julio's / Tulsa
New Construction, Infrastructure - 7,693 SF
Construction
$1,752,382 CJ est. value
Tulsa, OK 74133

South Boulder Avenue Office Renovation
New Construction, Infrastructure - 5,524 SF
Pending Verification
$1,076,738 CJ est. value
Tulsa, OK 74119

WeConnect Office Expansion
Demolition, Renovation, Infrastructure - 866 SF
Pending Verification
$40,000 CJ est. value
Tulsa, OK 74137

Vandever East 6th Addition - City of Broken Arrow
Alteration
Conception
$485,000 est. value
Broken Arrow, OK

Last Updated 03/21/2023 04:35 AM
Project Title

I-44 - Utilities

Physical Address View project details and contacts
City, State (County) Tulsa, OK 74145   (Tulsa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected February 2031
Bids Due View project details and contacts
Estimated Value $2,013,883 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Tulsa: I-44 at Us 169 Interchange(Selected Movements)(Ut for 10981(05) As of March 21, 2023, the project is in Design status. Anticipated letting month/year is June , 2030. Length : 0.300 Mi. OKDOT - I-44 - Utilities *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents