Similar Projects
Comprehensive Infrastructure for Tampa’s Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Ash Monofill Leachate Force Main Modifications
Bidding
Felda, FL 33930

Subaqueous Sewer Force Main Replacements (Crossings)
Bidding
Naples, FL

Rivertown Kendall Drive - Phase 2
New Construction
Post-Bid
Jacksonville, FL

Glades County Community Development Block Grant Project Washington Park Sanitary Improvements
Post-Bid
$550,000 est. value
FL

Greenboro Forcemain Replacement Project
Results
$649,000 est. value
West Melbourne, FL 32904

Mecca Force Main Extension Project
Results
Fort Lauderdale, FL 33301

RIVERTOWN MAIN STREET Phase 3
New Construction
Construction
Jacksonville, FL

NED SHIP Septic System Repair for 2918 West Gonzalez Street
Bidding
Pensacola, FL 32505

US-98 Sanitary Force Main Improvements
Post-Bid
$600,000 to $700,000 est. value
Sebring, FL 33876

Inflow/Infiltration Project Phase 2
Results
Clewiston, FL 33440

Harbour Drive Force Main Replacement
Bidding
Naples, FL 34103

Pipeline Pig Service
Post-Bid
Less than $210,000 est. value
Tampa, FL 33601

259 and 263 North Courtenay Parkway 4" Sewer Lateral Repair
Results
Merritt Island, FL 32953

Rehabilitation of Sewer Manholes
Bidding
Miramar, FL 33023

Last Updated 04/22/2021 12:22 PM
Project Title

Port Labelle Utility System Cast Iron Sewer Pipe Replacement

Physical Address View project details and contacts
City, State (County) FL   (Hendry County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes but is not limited to the removal and replacement of approximately 1,025 feet of 8-inch cast iron gravity sewer with 8-inch SDR 26 PVC. The gravity mains are at depths ranging from approximately 7 feet to 13 feet. The work also includes mechanically cleaning a portion of a gravity sewer that includes approximately 203 feet of 8-inch clay pipe and 125 feet of 8-inch cast iron pipe; only the cast iron portion is to be mechanically cleaned. Subsequently the main will be inspected and the clay and cast iron pipe will be lined by Cured-In-Place-Pipe (CIPP).

Details

Division 02 - Existing Conditions.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents