Similar Projects
Buckroe Resilient Hampton/Development Projects - City of Hampton
Infrastructure
Conception
$3,100,000 est. value
Hampton, VA

Downtown Resilient Hampton/Development Projects - City of Hampton
Infrastructure
Conception
$4,500,000 est. value
Hampton, VA

Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for Utility Mechanical Construction Services
Infrastructure
Bidding
$95,000,000 est. value
Hampton, VA

Blue Heron Landing Park
Renovation, Demolition, Infrastructure, Alteration
Post-Bid
Less than $775,000 est. value

Shoreline Improvements Air Power Park
Results
Hampton, VA 23666

North Campus BMP Improvements
Infrastructure
Results
Hampton, VA 23666

Phoebus Resilient Hampton/Development Projects - City of Hampton
Infrastructure
Conception
$3,100,000 est. value
Hampton, VA

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

Sandy Bottom Nature Park - City of Hampton
Infrastructure
Conception
$500,000 est. value
Hampton, VA 23666

Storm Water Drain Maintenance
Term Contract
Results
Hampton, Newport News, VA

Briarfield Park - City of Hampton
New Construction, Alteration
Conception
$1,200,000 est. value
Hampton, VA 23661

Case Coal, Llc Bond Forfeiture
Alteration
Results
$110,000 to $180,000 est. value
Duffield, VA 24244

Salt Pond Dredging - City Of Hampton
Alteration
Conception
$700,000 est. value
Hampton, VA

Aluminum Arch Pipe
Infrastructure
Results

Aluminum Structural Plate Arch Pipe And Aluminum Structural Plate Headwalls - Fabrication, Delivery, Assembly And Installation Supervision
Infrastructure
Results

Reported 07/11/2022 03:25 PM
Project Title

Billy Woods Canal (Butler Farm Road Wet Ponds) - City of Hampton

Physical Address View project details and contacts
City, State (County) Hampton, VA 23666   (Hampton City County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $5,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Hampton, Virginia. Conceptual plans call for site work for a water / sewer project. The Billy Woods Canal is located behind commercial and residential properties that feed into the Back River. This project will increase upstream water storage with the goal of both reducing downstream flooding and increasing the volume of treated stormwater to improve water quality following rain events. The project will enhance native habitat and create public access to green and blue space. This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of July 08, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents