Similar Projects
Bon Air Housing Units Roof Replacement
- 79,526 SF
Bidding
Bon Air, VA 23235

Z1DA--Building 514 Roof Repair (VA-21-00046652)
Bidding
Richmond, VA 23249

Roofing and Repair Service
Term Contract
Post-Bid

VMFA Pauley Center Re-Roofing Project
Post-Bid
Richmond, VA

Roof Replacement Thomas Dale High School
Results
Less than $576,587 est. value
Chester, VA 23831

Replace Roof WH44
Results
$1,000,000 to $5,000,000 est. value
Richmond, VA 23113

Roof Replacement at Chester Early Childhood Learning Academy
Bidding
$250,000 est. value
Chester, VA 23831

Roofing Envelope Services
Post-Bid

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Roofing MACC
Post-Bid

JSRCC-D Roof Replacement Academic Building
Results
Richmond, VA

Roofing Repair and Maintenance
Post-Bid

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Building 120 Roof Replacement
Demolition - 44,123 SF
Results
Richmond, VA 23218

Roof Replacement at J.B. Fisher and Bellevue Elementary Schools
Results
Richmond, VA 23223

Last Updated 11/04/2020 07:13 AM
Project Title

Replace Roof WH 44 DLA Richmond

Physical Address View project details and contacts
City, State (County) Richmond, VA 23220   (Chesterfield County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION: U.S. Army Corps of Engineers (USACE) Norfolk District is seeking a business capable of replacing the existing Warehouse 44 roof as well as two passageways that lead from Building 9 and Building 12. Work includes removal of the existing roof material and replacement with new material. Damaged wood substrate and insulation will be removed and replaced as needed. Existing roof mounted equipment and appurtenances will be removed and replaced to facilitate roof replacement. Deteriorated wood fascia and trim boards will also be replaced. Painting of all access ladders and pipe railings is also included. Work also includes replacement of gutters and down leaders. The design and construction shall also comply with federal environmental and energy standards.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents