Similar Projects
LTS Piping Improvements - SR-23-001 - City of Jacksonville
Infrastructure
Conception
$1,600,000 est. value
Jacksonville, NC 28540

Brynn Marr Water Tank Upgrades - WT-21-002 - City of Jacksonville
Infrastructure
Conception
$500,000 est. value
Jacksonville, NC 28540

18 N-12 HDPE IB/WT Double Wall 20
Post-Bid
Jacksonville, NC

Ductile Iron Wide Range Transition Coupling
Post-Bid
Jacksonville, NC

Badger 5/8" X 3/4" and 3" Ultrasonic Water Meters
Results
Less than $19,625 est. value
Jacksonville, NC

3 Ultrasonic Water Meter
Results
Less than $1,265 est. value
Jacksonville, NC

N-12 Hdpe Ib/Wt Double Wall N-12-FY22
Infrastructure
Post-Bid
Jacksonville, NC

Badger M25 5/8 and M35 3/4 Water Registers
Results
Jacksonville, NC

5/8" X 3/4" Ultrasonic Water Meters
Infrastructure
Post-Bid
Jacksonville, NC

Badger 1 and 2 Ultrasonic Water Meters
Results
Jacksonville, NC

Swing Check Valve Repair
Infrastructure
Post-Bid
Jacksonville, NC

2021 Surf City Interconnection Replacement Project
Infrastructure
Results
Jacksonville, NC

New Bridge Street Infrastructure Phase 1 with Bid Alternative for Phase 2
Infrastructure
Post-Bid
Jacksonville, NC 28540

Water Systems Maintenance
Term Contract
Results
Camp Lejeune, NC

2022 Onwasa Holly Ridge Water Legacy Line Replacement Project
Infrastructure
Post-Bid
Holly Ridge, NC 28445

Reported 07/14/2022 01:57 PM
Project Title

Gum Branch Central Chlorine - Wt-21-005 - City Of Jacksonville

Physical Address View project details and contacts
City, State (County) Jacksonville, NC 28540   (Onslow County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2023
Bids Due View project details and contacts
Estimated Value $485,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovate building and add a chlorine scrubber system. As of July 13, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents