Similar Projects
Noise Insulation Program Design Services at Hjaia
Term Contract, Infrastructure
Bidding
GA 30320

Noise Insulation Program Design Services at Hjaia
Term Contract, Infrastructure
Bidding
GA 30320

Welcome All Road Engineering Design Services
Term Contract
Post-Bid
East Point, GA

CDBG Professional Engineering Services - 1
Post-Bid
College Park, GA 30337

Design Services of Earthen Dam, Reservoir, and Intake Structure
Results
Jefferson, GA

Chason Park Expansion Project
New Construction
Results
Bainbridge, GA 39817

On-Call Architectural Services
Term Contract
Bidding
Stockbridge, GA

Engineering Design Svcs for TIA Projects Batch 8
Term Contract
Post-Bid

Advanced Metering Infrastructure System
Infrastructure
Results
Canton, GA

As Needed City-Wide Architectural, Planning, Design, Engineering and Construction Phase Services for City Facilities (Group A- Small)
Post-Bid
Atlanta, GA

Cumming Academic Building Addition
Addition, Infrastructure
Results
$200,000 est. value
Cumming, GA 30040

Task Order Architectural and Engineering Services
New Construction
Post-Bid
Atlanta, GA 30334

A/E Services Group A Fire Sprinkler Installation
New Construction, Alteration
Results
Decatur, Stone Mountain, GA 30032

ABMS Maintenance/Logistics Facility, Robins AFB
New Construction - 227,000 SF
Post-Bid
$10,000,000 CJ est. value
Warner Robins, GA

A/E Services Group B Fire Sprinkler Installation
New Construction, Alteration
Results
Atlanta, Doraville, Stone Mountain, Tucker, GA 30083

Last Updated 04/12/2022 02:45 PM
Project Title

Architect-Engineer Supplemental Services - Southeast Regional Office

Physical Address View project details and contacts
City, State (County) State-Wide: AL, FL, GA, MS, PR, SC
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Federal Bureau of Prisons (BOP), Southeast Regional Office (SERO) anticipates the need for a multiple award, indefinite delivery indefinite quantity (IDIQ), firm fixed price contract for supplemental architect-engineer (A/E) services with a one-year base requirement and up to four option years. While the Government anticipates multiple awards, no more than two awards are expected. The services will be for various BOP facilities in the Southeast Region to include Alabama, Florida, Georgia, Mississippi, South Carolina, and Puerto Rico. Disciplines and services may include, but are not limited to: architecture, electrical, mechanical, structural, civil and geotechnical engineering, elevator, life safety, fire safety, code-compliance, LEED certification, Section 106, hazardous material consultant services, life safety inspections, investigations, land surveys, materials testing services, comprehensive subsurface investigations, preparation of construction documents, estimates, bidding services, construction administration and/or assistance to BOP staff in the preparation of in-house designs or related work. Services may also include special studies, reports, programming, site evaluations, environmental assessment for remediation, and other associated work. Most projects will take place in a fully occupied, fully operational, secure correctional environment. Most projects require complex design effort and detail along with extensive coordination between design disciplines, the institution, and the Regional Office during design and construction. Institutions, located at a total of seventeen (17) different site locations in the Southeast Region, are comprised of two prison complexes, several institutions and satellite camps. Projects at select institutions may involve issues of national security. Given the close coordination needed between the successful firm(s) and regional office, selection of firms will be limited geographically to those located within a 50-mile radius of the Southeast Regional Office, located at 3800 Camp Creek Parkway, SW, Building 2000, Atlanta, Georgia 30331

Details

Division 01 - General Requirements.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents