Similar Projects
Martin Downs Water Treatment Plant
Renovation, Addition
Conception
$13,500,000 est. value
Palm City, FL 34990

Buenaventura Lakes Water Treatment Plant Upgrade & Improvements
Addition
Conception
Kissimmee, FL

Wastewater Treatment Plant and Associated Appurtenances
Design
FL

Water Reclamation Facility Expansion
Addition
Design
Clermont, FL

Water Treatment Plant Generator Replacement Renovations
Renovation
Bidding
$210,364 est. value
Vero Beach, FL 32960

Water Treatment Plant Reverse Osmosis Skid Addition
Addition
Bidding
$3,700,000 est. value
Hallandale Beach, FL 33009

Mid-County Waste Water Treatment Plant Headworks
New Construction
Post-Bid
$5,000,000 est. value
Dunedin, FL 34698

Lime Slaker System
Post-Bid
Less than $750,000 est. value
Pompano Beach, FL 33064

Mourning Dove WTP - Solids Train Upgrade
Results
Less than $11,000,000 est. value
Titusville, FL 32796

J046--Fy20: RFI Water Treatment Boiler and Chiller
Results
Tampa, FL 33612

Water Treatment Plant Operations Building Reconstruction and Remodel
Construction
Less than $2,400,000 est. value
Panama City, FL 32404

Carlton WTF Rehabilitation, Phase 2
Construction
$4,675,055 est. value
Venice, FL 34292

East Plant Upgrades/Improvements
Renovation
Pending Verification
$5,247,000 est. value
Clearwater, FL

Groundwater Replenishment Facility
New Construction
Pending Verification
$34,258,000 est. value
Clearwater, FL

Lake Lotus Regional SWT Facility - Orange County
New Construction
Conception
$5,000,000 est. value
Orlando, FL

Reported 07/14/2022 12:00 AM
Project Title

Sunshine Water Services Mid-County - Waste Water Treatment Plant to Membrane Bioreactor Treatment System

Physical Address View project details and contacts
City, State (County) Dunedin, FL 34698   (Pinellas County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the conversion of the existing Mid-County Wastewater Treatment Plant (WWTP) to a membrane bioreactor (MBR) treatment system including associated equipment and process upgrades.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling, Demolition, Selective Site Demolition.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Stairs, Metal Railings.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Vapor Retarders, Joint Sealants.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 26 - Electrical, Common Work Results for Electrical, Raceway and Boxes for Electrical Systems, Surface raceways for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Panelboards, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents