Similar Projects
Martin Downs Water Treatment Plant
Renovation, Addition
Conception
$13,500,000 est. value
Palm City, FL 34990

Buenaventura Lakes Water Treatment Plant Upgrade & Improvements
Addition
Conception
Kissimmee, FL

Wastewater Treatment Plant and Associated Appurtenances
Design
FL

Glen Abbey Water Treatment Plant Water Quality Improvements
Renovation
Design
$2,500,000 est. value
Orange City, FL 32763

Reclaimed Water Disinfection and Compliance Upgrades
Renovation
Bidding
$3,055,000 est. value
Boca Raton, FL 33431

Sunshine Water Services Mid-County - Waste Water Treatment Plant to Membrane Bioreactor Treatment System
Renovation
Bidding
Dunedin, FL 34698

Mid-County Waste Water Treatment Plant Headworks
New Construction
Post-Bid
$5,000,000 est. value
Dunedin, FL 34698

Water Treatment Plant Operations-Everglades Holiday Park
Term Contract
Post-Bid
Fort Lauderdale, FL 33332

Mourning Dove WTP - Solids Train Upgrade
Results
Less than $11,000,000 est. value
Titusville, FL 32796

J046--Fy20: RFI Water Treatment Boiler and Chiller
Results
Tampa, FL 33612

Water Treatment Plant Operations Building Reconstruction and Remodel
Construction
Less than $2,400,000 est. value
Panama City, FL 32404

Consolidated Rivertown WTP Project Package
New Construction
Construction
Saint Johns, FL 32259

East Plant Upgrades/Improvements
Renovation
Pending Verification
$5,247,000 est. value
Clearwater, FL

Groundwater Replenishment Facility
New Construction
Pending Verification
$34,258,000 est. value
Clearwater, FL

Southeast Regional Water Reclamation Facility Improvements
Renovation, Addition
Conception
Oak Hill, FL 32759

Last Updated 06/27/2022 04:13 PM
Project Title

Water Reclamation Facility Expansion

Physical Address View project details and contacts
City, State (County) Clermont, FL   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Construction Documents
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Expand the East side Water Reclamation Facility for the City of Clermont.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents