Similar Projects
Crofton Meadows II WTP Raw Water Main Valve Modifications
Infrastructure
Bidding
$300,000 to $800,000 est. value
Annapolis, MD

Granular Activated Carbon Filtration System Installation and Maintenance
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value

Valve and Fire Hydrant Assessment Operation and Maintenance
Term Contract
Post-Bid
$8,000,000 est. value
Baltimore, MD 21270

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water Main Repair- Replace Valve Bonnet Bolts Phase 4
Results
$1,000,000 to $3,000,000 est. value
Annapolis, MD 21401

Galvanized Pipe Replacement (RGH)
Post-Bid
Laurel, MD 20707

Area Water And Sewer House Connection Construction
Term Contract
Results
Laurel, MD 20707

Large Meter Inspections and Replacement Services
Term Contract, Infrastructure
Post-Bid

Water Meter Test Bench System
Results
$235,000 est. value
Annapolis, MD 21401

Task Order 80 - Fitzpatrick Water Main Replacement
Infrastructure
Post-Bid
Laurel, MD 20707

Fort Smallwood/Nursery Road Valve Replacement
- 5,534 SF
Results
$2,000,000 to $3,000,000 est. value
Annapolis, MD 21401

Task Order 79 - Tangelwood Water Main Replacement
Infrastructure
Post-Bid
Laurel, MD 20707

San Juan Drive Water Main Replacement
Results
Laurel, MD

RT3 Water Main Crossing
Results
$100,000 to $500,000 est. value
MD

Tanyard Springs Road Widening and Water Main
Results
$1,000,000 to $1,500,000 est. value
Annapolis, MD 21401

Last Updated 09/17/2021 01:15 PM
Project Title

Pine Haven SPS FM ARV Replacement

Physical Address View project details and contacts
City, State (County) Annapolis, MD   (Anne Arundel County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes the following major items: The removal and replacement of approximately 203 lf of the existing 12- inch diameter force main with ductile iron pipe, installation of three combination air/vacuum valve in vaults, line stopping with temporary bypass piping and installation of a new 12-inch insertion valve to replace the existing isolation valve at the intersection of Fort Smallwood Road and Duvall Highway.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents