Similar Projects
The Pointe at 53rd
New Construction
Conception
Murray, UT 84107

Sage Valley Apartments Phase 2
New Construction
Conception
West Valley City, UT

370 Millennium Tower
New Construction - 284,500 SF
Design
Salt Lake City, UT 84111

Cottonwood Mall Redevelopment
New Construction
Design
Holladay, UT 84117

Tradition Point Apartments
New Construction
Bidding
Murray, UT 84107

Snelgrove Ice Cream Plant Redevelopment
New Construction - 435,000 SF
Sub-Bidding
Salt Lake City, UT 84106

Alta Depot
New Construction - 434,303 SF
Post-Bid
$10,000,000 CJ est. value
Salt Lake City, UT 84102

The Zephyr
New Construction - 99,892 SF
Post-Bid
$6,827,300 est. value
Salt Lake City, UT 84101

DFCM Construction- UU Auxiliary Svcs West Village Family/Graduate Housing-22011750-VBS DB Stg II
New Construction - 442,000 SF
Results
$109,525,000 est. value
Salt Lake City, UT 84108

DFCM Construction - VBS CX Services - UU West Village Family and Graduate Housing
New Construction, Alteration - 442,000 SF
Results
$109,525,000 est. value
Salt Lake City, UT

Liberty Sky Residential Tower
New Construction
Construction
$90,000,000 est. value
Salt Lake City, UT 84111

Block 67
New Construction - 430,000 SF
Construction
$5,454,500 est. value
Salt Lake City, UT 84111

The Cliffs at Jordan Station
New Construction
Pending Verification
South Jordan, UT

800 South & State
New Construction
Pending Verification
Salt Lake City, UT

Mixed Use Project
New Construction
Conception
Salt Lake City, UT 84102

Reported 12/23/2021 03:19 PM
Project Title

Moda Union

Physical Address View project details and contacts
City, State (County) Midvale, UT 84047   (Salt Lake County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method
Project Status Building in Operation as of fourth quarter 2021
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Apartments/Condominiums, 5 Stories Above Grade, 321,692 SF New Construction 206 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents