Similar Projects
PA 756 - Alvin St to Industrial Park Rd
Infrastructure
Conception
$8,726,367 CJ est. value
Richland, PA 15904

PA 756 - Alvin St to Industrial Park Rd
Infrastructure
Conception
$8,726,367 CJ est. value
Richland, PA 15904

Dutch Road Bridge Replace
Infrastructure, Renovation
Design
$1,063,364 CJ est. value
Loretto, PA 15940

Dutch Road Bridge Replace
Infrastructure, Renovation
Design
$1,063,364 CJ est. value
Loretto, PA 15940

Milling of Bituminous Pavement
Post-Bid
Johnstown, PA 15902

Major Bridge P3
New Construction
Post-Bid

Demolition, Site Clearance and Site Restoration
Demolition
Results
Franklin, Hastings, Johnstown, PA

Phase 3 Site Improvements
Results
Cresson, PA

Double Sealcoat With RS-2PM (E-2M) / CRS -2PM ( E-3M)
Infrastructure
Construction
$69,845 CJ est. value
Johnstown, PA 15901

Double Sealcoat With RS-2PM (E-2M) / CRS -2PM ( E-3M)
Infrastructure
Construction
$69,845 CJ est. value
Johnstown, PA 15901

PA 756 - PA 160 to Industrial Park Rd
Infrastructure
Conception
$2,846,627 CJ est. value
Adams Township, PA 15934

Summerhill PA 53 Laurel Run
Infrastructure
Design
$1,193,798 CJ est. value
Summerhill, PA 15958

2021 Paving Project
Infrastructure
Post-Bid
Johnstown, PA

Clean Fill Site Maintenance
Term Contract
Results
Johnstown, PA

Sidman PA 160 Super Repl 2
Infrastructure
Conception
$2,387,189 CJ est. value
Croyle Township, PA 15958

Last Updated 12/23/2022 01:01 AM
Project Title

Mt Airy Drive over US 219 Rehab

Physical Address View project details and contacts
City, State (County) Richland, PA 15904   (Cambria County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected November 2025
Bids Due View project details and contacts
Estimated Value $2,582,386 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

On SR 3104 (Mount Airy Drive) over US 219 in Richland Township, Cambria County. Primary Improvement Type: Bridge Replacement As of December 23, 2022, the project is In development stage. Anticipated letting date is September 04, 2025. PennDOT - Mt Airy Drive over US 219 Rehab *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents