Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for Renovation, Repair, and New Construction, of Medical Facility Construction at Various Government Installations
New Construction, Renovation
Design
$15,000,000 to $1,000,000,000 est. value

Replacement Hospital
New Construction
Design
Prosser, WA

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

Process Development Laboratory East Modifications
Demolition, Renovation, Infrastructure
Bidding
$500,000 CJ est. value
Richland, WA 99354

Prosser Memorial Health Replacement Hospital - BP-13 Casework and Millwork
Demolition, New Construction, Infrastructure
Sub-Bidding
$50,000 CJ est. value
Prosser, WA 99350

Prosser Memorial Health Replacement Hospital - BP-13 Casework and Millwork
Demolition, New Construction, Infrastructure
Sub-Bidding
$50,000 CJ est. value
Prosser, WA 99350

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

WATER3 Hydrants (54, 66, 73, 74, 75)
Infrastructure
Post-Bid
$500,000 CJ est. value
Richland, WA 99352

X-Energy Reactor Nuclear Plant - Tri-Energy Partnership
New Construction, Infrastructure
Pending Verification
$2,400,000,000 CJ est. value
Richland, WA 99352

US 730/5.2 Miles N of Oregon Border - Rockfall Prevention
Infrastructure
Design
$1,063,000 CJ est. value
Benton City, WA 99320

Tri Tech Skills Center - Building C
New Construction, Infrastructure - 9,600 SF
Bidding
$3,500,000 CJ est. value
Kennewick, WA 99336

Prosser Memorial Health Replacement Hospital - BP-22 Paints and Coatings, BP-23 Wall Coverings
Demolition, New Construction, Infrastructure
Sub-Bidding
$400,000 CJ est. value
Prosser, WA 99350

2022 Main Turbine Crane Bridge and Trolley Upgrades
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Kennewick, WA 99336

Stevens Drive Pavement Preservation
Infrastructure
Design
$1,200,000 CJ est. value
Richland, WA 99354

Prosser Memorial Health Replacement Hospital - BP-31 Asphalt Paving Markings, BP-32 Site Concrete
Demolition, New Construction, Infrastructure
Sub-Bidding
$70,000,000 CJ est. value
Prosser, WA 99350

Last Updated 08/24/2022 05:34 AM
Project Title

Prosser Memorial Health Replacement Hospital - BP-25 Window Coverings, BP-26 Elevators, BP-27 Pneumatic Tube

Physical Address View project details and contacts
City, State (County) Prosser, WA 99350   (Benton County)
Category(s) Heavy and Highway, Medical
Sub-Category(s) Hospital, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Bouten Construction Company has been selected as the GC/CM on the Prosser Memorial Health - Replacement Hospital project (PMHRH).We are inviting you to bid on this project. Below is important information and dates to bid this project. The project site is located in the city of Prosser at 200 Prosser Health Drive. It will occupy a 30-acre parcel with 101,000sf of buildings and associated sitework. This is a new two-story Critical Access Hospital, medical office building, and maintenance building. The estimated construction cost is approximately $70,000,000 with construction beginning in November 2022 and completion by November 2024. Bouten Construction Company is soliciting bids from suppliers and subcontractors to furnish and/or perform work at the Prosser Memorial Health Replacement Hospital project in Prosser, WA. Bouten Construction Company will enter into contracts with all subcontractors, suppliers, and vendors involved in this project, and will serve as General Contractor / Construction Manager for the project. Below is the bid schedule for each Bid Package: BP # Bid Package Description Bid Date Bid Time BP-25 Window Coverings BP-26 Elevators BP-27 Pneumatic Tube No bidder may withdraw its bid after the hour set for the opening thereof, unless the award of the contract is delayed for a period exceeding 90 calendar days. Bids received after the date and time stated above WILL NOT receive consideration. Any firm failing to submit its proposal in accordance with the procedures set forth in the Instructions to Bidders may be considered non-responsive. Successful bidders for this work will be subcontracting directly with Bouten Construction Company using the Bouten Construction Company Subcontract Agreement and/or Purchase Agreement included as an exhibit in each Bid Package. BID GUARANTEE A bid guaranty must be submitted with the bid for all bid amounts equal to or greater than $300,000. A surety company bid bond on the bid bond form provided in each bid package, standard AIA bid bond form, a cashier's check, or certified check payable to the order of Bouten Construction Company, must accompany each such bid and shall be in an amount not less than five percent (5%) of the bid that may be awarded including the base bid and any additives and/or alternates. Failure of the bidder to provide an acceptable bid guarantee with the bid shall render the bid non-responsive. PAYMENT & PERFORMANCE BOND All subcontractors shall provide separate payment and performance bonds by a qualified surety company acceptable to the GC/CM, each for 100% of the contract sum including all change orders and alternates, when this amount is equal to or greater than $300,000. The cost of the payment and performance bonds must be included in their bid amount. The successful subcontractor will have 3 business days from the time of request to supply these bonds to the GC/CM. If the subcontractor is unable to supply separate payment and performance bonds, the GC/CM may reject their bid and elect to use the next responsible bidder. QUESTIONS Questions that develop during the bid period must be faxed or emailed to Bouten Construction Company Attn: Sean Gossett Tel: (509) 943-7677 or email: seang@boutenconstruction.com. DO NOT present questions to the Owner, Architect, or Engineers. All written questions and their answers will be published via addenda during the bid period. Questions for all packages are due by 5:00PM on August 12, 2022. MWBE GOALS Prosser Memorial Health and Bouten Construction Company are committed to the participation in its contracts by MWBE firms certified by the State of Washington's Office of Minority and Womens Business Enterprises (OMWBE). No minimum level of MWBE participation shall be required as a condition of this subcontract, however MWBE participation is strongly encouraged. REJECTION OF BIDS Prosser Memorial Health reserves the right to reject any or all bids, and the right to waive any informalities or irregularities in any bids received.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Support Assemblies, Healthcare Metal Supports.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Service Walls, Patient Bed Service Walls, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Protective Covers.
Division 11 - Equipment, Mercantile and Service Equipment, Vending Equipment, Foodservice Equipment, Ice Machines, Cleaning and Disposal Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Operating Room Equipment, Solid Waste Handling Equipment.
Division 12 - Furnishings, Window Blinds, Casework, Furniture, Seating, Institutional Furniture, Healthcare Furniture.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems, Healthcare Intercommunications and Program Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Radiation Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents