Last Updated | 10/22/2021 08:41 AM |
Project Title | Replace Medium-Voltage FPL Cable , Conduit, and Brackets on Bridge 875101 |
Physical Address | View project details and contacts |
City, State (County) | Bay Harbor Islands, FL (Miami-Dade County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $172,808 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Repair would install a brand-new conduit made of PVC Schedule 80, with a 3.5” trade-size. The new conduit would be supported by stainless steel brackets, installed at the bottom flange of the metal I-Girder. The spacing of the support brackets would be 5 Ft. FPL has been contacted about this situation and are waiting for the bridge owner/operator to install the new conduit and new 3-phase MV 7.2kv # 1/0 AWG cables. The existing cables have been stressed under the load of their own weight and therefore, calls for the entire 1,000 Ft run of cable to be replaced. Once accomplished, FPL will proceed with the re-splicing of the new cables into their system, at the Island’s FPL MV pull box. The proposed conduit system mounts on the metal I-Girder of the bridge, hence it does not require any drilling into the bridge’s concrete, which, built in 1950, may contain asbestos. |
||||||||||||||||||
Details | Bridge, New Construction.
|
||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |