Similar Projects
West Aventura Town Center
New Construction, Build-Out, Demolition - 44,099 SF
Design
Aventura, Miami, FL 33180

Doral Pedestrian Bridge Design Build
Bidding
$4,800,000 est. value
Doral, FL

Develop, Operate and Maintain Rickenbacker and Venetian Causeways
Renovation
Bidding
Miami, FL 33132

Bridge Replacement at SW 136 Street Over C-100A Canal - Bridge No. 874420
New Construction
Post-Bid
$1,707,083 est. value
FL

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Southwest 42nd Avenue Over Coral Gables Canal Bridge No. 874275 Beam Repairs
Results
Less than $84,658 est. value
Miami, FL 33128

77th Street Bridge Over E Biscayne Point Canal Repairs
Results
Less than $650,000 est. value
Miami Beach, FL

Add Lanes and Rehabilitate Pavement/New Bridge Construction-Sr 25 (Okeechobee rd)
New Construction, Infrastructure
Bidding
$107,176,635 est. value
FL

Bridge Repairs Project
Renovation
Post-Bid
North Miami, FL 33181

Bridge Deck Striping
Results
Less than $500,000 est. value

Bridge Repair- Structural Repair Miami-Dade County - Bridge-Routine Maint
New Construction, Infrastructure
Bidding
$450,000 est. value
FL

Design-Build Services for the Underline - Phases 3 - 9
New Construction, Infrastructure
Post-Bid
$100,608,364 est. value
FL

Districtwide Movable Bridge Asset Maintenance-Performance Ba
Results
Less than $25,900,000 est. value

Resurfacing/Bridge Repair and Rehabilitation
New Construction, Infrastructure
Bidding
$4,536,445 est. value
FL

Spall and Joint Bridge Repair - 15th Avenue Over Snake Creek Canal
Renovation, Infrastructure
Post-Bid
North Miami Beach, FL 33179

Last Updated 10/22/2021 08:41 AM
Project Title

Replace Medium-Voltage FPL Cable , Conduit, and Brackets on Bridge 875101

Physical Address View project details and contacts
City, State (County) Bay Harbor Islands, FL   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $172,808
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Repair would install a brand-new conduit made of PVC Schedule 80, with a 3.5” trade-size. The new conduit would be supported by stainless steel brackets, installed at the bottom flange of the metal I-Girder. The spacing of the support brackets would be 5 Ft. FPL has been contacted about this situation and are waiting for the bridge owner/operator to install the new conduit and new 3-phase MV 7.2kv # 1/0 AWG cables. The existing cables have been stressed under the load of their own weight and therefore, calls for the entire 1,000 Ft run of cable to be replaced. Once accomplished, FPL will proceed with the re-splicing of the new cables into their system, at the Island’s FPL MV pull box. The proposed conduit system mounts on the metal I-Girder of the bridge, hence it does not require any drilling into the bridge’s concrete, which, built in 1950, may contain asbestos.

Details

Bridge, New Construction.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents