Similar Projects
West Henderson Parks And Recreation, Phases 2 - 5 - PR247 - City Of Henderson
New Construction, Infrastructure
Conception
$84,000,000 CJ est. value
Henderson, NV 89015

Burkholder Blvd - Warm Springs To Russell, Phase 2 - ST093 - City Of Henderson
Infrastructure
Conception
$6,600,000 CJ est. value
Henderson, NV 89015

Boulder Lodge Expansion
Addition, Demolition, Renovation, Infrastructure
Design
$9,600,000 CJ est. value
Henderson, NV 89015

Tropicana Grand Canyon Apartments
New Construction - 682 SF
Design
Las Vegas, NV 89147

AutoZone #2208 / Las Vegas
New Construction, Infrastructure - 26,170 SF
Bidding
$7,000,000 CJ est. value
Las Vegas, NV 89115

Hualapai Way-Russell Road to CC215, and Flamingo Road - Hualapai Way to Grand Canyon Drive
Infrastructure
Bidding
$7,098,173 CJ est. value
Summerlin South, NV 89135

Delta Academy - Exterior
Alteration
Post-Bid
$85,680 est. value
North Las Vegas, NV 89030

Centennial And Lamb Commercial Site Work
Alteration
Post-Bid
North Las Vegas, NV 89115

Pavement Maintenance and Site Improvements
Results
$225,000 est. value
Las Vegas, NV 89131

Jones Maintenance Yard Expansion -Jones Boulevard And Pyle Avenue
Results
$4,826,854 to $5,334,944 est. value
Las Vegas, NV 89141

Touro University Parking Expansion Phase II
New Construction
Construction
Henderson, NV 89014

Inspirada Marketplace
New Construction - 39,460 SF
Construction
$10,000,000 est. value
Henderson, NV 89009

Evel Knievel Museum Las Vegas
New Construction
Pending Verification
Las Vegas, NV

Matter Logistics at North 15
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
North Las Vegas, NV 89030

Cactus, Las Vegas Boulevard to Bermuda - Clark County
Infrastructure
Conception
Las Vegas, NV 89183

Last Updated 08/23/2022 10:32 AM
Project Title

Historic Westside Museum and Performing Arts Center - City of Las Vegas

Physical Address View project details and contacts
City, State (County) Las Vegas, NV 89101   (Clark County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Museum, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will undertake community engagement focused on local history, historic resources, workshops and open dialogue for the future development of an African-American museum and performing arts theatre. Through these outreach efforts, a detailed evaluation report will support evidence of the historic resource data to inform the design review process for the development of the museum and theatre. Additionally this outreach will help determine and shape: the focus of the museum and theatre; develop a museum and theatre master plan including project positioning, site planning, and operational model; identify funding sources for museum and theatre development; and establish an organizational management model. Ultimately, this design will align with the City of Las Vegas' HUNDRED Plan, a largescale urban planning initiative to revitalize the Historic Westside by 2035. This project is included in the city’s FY 2023-2027 Capital Improvement Program. As of August 23, 2022, further details regarding design and firm construction tie timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents