Similar Projects
Core Durham
New Construction, Infrastructure - 120,000 SF
Design
$23,000,000 CJ est. value
Durham, NC 27701

Core Durham
New Construction, Infrastructure - 120,000 SF
Design
$23,000,000 CJ est. value
Durham, NC 27701

TROSA West Dorm Building
New Construction, Infrastructure - 17,517 SF
Bidding
$4,000,000 CJ est. value
Durham, NC 27707

Widens I-40 to A Six-Lane Facility From I-85
Post-Bid

Bituminous Plant Mix Asphalt
Term Contract
Post-Bid

Pavement Preservation 2021
Results
Durham, NC

Milling, Paving, and Striping of the Foster Street Parking Lot
Results
Less than $22,417 est. value
Durham, NC

Northern Durham Convenience Site Construction
Construction
Less than $2,470,000 est. value
Rougemont, NC 27701

Leesville Road Assemblage
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Durham, NC 27703

Leesville Road Assemblage Residential
New Construction, Infrastructure
Pending Verification
$130,000,000 CJ est. value
Durham, NC 27703

Carrington Woods II
New Construction, Infrastructure
Design
$9,000,000 est. value
Durham, NC 27703

Newcastle Site Improvements
Alteration
Post-Bid
Durham, NC 27703

Milling and Short Overlays at Bridges
Results

Lochwood
New Construction, Infrastructure
Pending Verification
$41,000,000 CJ est. value
Durham, NC 27703

Stella View Multi-Residential Development / Durham
New Construction, Infrastructure
Design
$88,000,000 CJ est. value
Durham, NC 27703

Last Updated 08/18/2022 02:09 PM
Project Title

Southern Durham Resurfacing Package, Milling

Physical Address View project details and contacts
City, State (County) Durham, NC 27701   (Durham County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $180,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

DPS Southern Durham Resurfacing Package, Milling, Bethesda Ruritan Community Center Lot #1, Burton Elementary School Lot #1, Parkwood Elementary School Route #3, Pearsontown Elementary School Lot #1, Lot #2, Lot #3, Route #1, R. N. Harris Elementary School Lot #1, Rogers-Herr Middle School Lot #2, Route #1, Hillside New Tech High School Lot #1, Lot #3, Lot #4, Route #1, Route #2, Jordan High School Lot #1, Lot #2, Lot #6 Project scope: 1.5" S9.5B Overlay, Full Depth Patching at 3" of Depth, 1.5" Milling, Variable Depth Milling, Applying Parking Lot Striping, Numbering, Lettering, and Paint Symbols. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of sixty (60) days. -Bid security required is 5% of the bid in cash, certified check, or Bid Bond. - Performance and Payment Bonds for 100% of the contract amount will be required. - Durham Public Schools reserves the right to reject any and all bids and to waive informalities or irregularities. Minority Business Participation: Bidders shall note that compliance with County of Durham MBE policies and the North Carolina Statute 143-128.2 (c) are required for this project. Iran Divestment Act: Bidders shall note that the submission of a bid constitutes the bidder's certification to the State Treasurer that, as of the date of bid, it is not listed on the Final Divestment List created and maintained by the North Carolina Department of State Treasurer (the "Treasurer's Office") pursuant to the Iran Divestment Act of 2015, Chapter 147-Article 6E of the General Statutes of North Carolina (the "Iran Divestment Act"). Project scope: 1.5" S9.5B Overlay, Full Depth Patching at 3" of Depth, 1.5" Milling, Variable Depth Milling, Applying Parking Lot Striping, Numbering, Lettering, and Paint Symbols. All questions must be received in writing by Friday, August 5, 2022 at 5:00 PM. All responses will be posted on Thursday August 11, 2022 no later than 5:00 PM. Questions may be sent to Tanita Nicholson at tanita.nicholson@dpsnc.net.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents