Similar Projects
Multiple Award Task Order Contract (MATOC) ($300M) for Construction Phase Services (CPS) for the US. Army Corps of Engineers, South Pacific and Southwestern Divisions in support of the Border Infrastructure Program
New Construction
Design
Less than $300,000,000 est. value

D/B Western MATOC
Design
$1,000,000 to $70,000,000 est. value

Defense Health Agency - Medical Facility Operations and Maintenance
Bidding
$2,500 to $90,000,000 est. value

Multiple Award Task Order Contract (AZ/NM/TX/OK)
Post-Bid
$2,000 to $40,000,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Post-Bid
$3,000,000 to $15,000,000,000 est. value

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Task Order Contract For Construction, Repair, And Alteration With Design-Build And Incidental Abatement For Gsa/Pbs Region 7
Renovation
Results
$2,000 to $3,500,000 est. value

Access Control Point Program Design Build II -- RFI(2)
Design

On-Call Facilities Construction Services
Post-Bid
Albuquerque, NM 87102

FY 18 Building 27496 Blast Doors, Kirtland Air Force Base, Bernalillo County, NM
Results
$10,000,000 to $25,000,000 est. value
Albuquerque, NM

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

Construction Inspection IDIQ
Post-Bid
$50,000 to $17,500,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

MATOC Construction Project - New Procurement - VISN 22
Design
$2,000 to $20,000,000 est. value

Z--Annex 1502000 Facility Investment Annex 1602000 Electrical
Post-Bid

Reported 03/18/2020 08:20 AM
Project Title

Regional Transportation Management Center

Physical Address View project details and contacts
City, State (County) Albuquerque, NM   (Bernalillo County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Partial interior renovation of the first floor of the former armory building ((55,000 sf), minor site modifications, replacement of the existing landscaping and irrigation system, construction of a new stair/elevator tower. Ops center, backup power and generator.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents