Similar Projects
Multiple Award Task Order Contract (AZ/NM/TX/OK)
Post-Bid
$2,000 to $40,000,000 est. value

Multiple Award Task Order Contract (AZ/NM/TX/OK)
Post-Bid
$2,000 to $40,000,000 est. value

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Regional Transportation Management Center
Renovation
Results
Albuquerque, NM

Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Task Order Contract For Construction, Repair, And Alteration With Design-Build And Incidental Abatement For Gsa/Pbs Region 7
Renovation
Results
$2,000 to $3,500,000 est. value

FY 18 Building 27496 Blast Doors, Kirtland Air Force Base, Bernalillo County, NM
Results
$10,000,000 to $25,000,000 est. value
Albuquerque, NM

Air Force Contract Augmentation Program (AFCAP) V
Results

Gamerco Building 320
Demolition
Results
Gamerco, NM

General Services Construction
Renovation
Results
Santa Fe, NM

FLETC Construction IDIQ, Artesia, NM
Results
$10,000,000 est. value
Artesia, NM 88210

Transit Maintenance Facility Construction
- 21,622 SF
Results
Less than $7,632,824 est. value
Espanola, NM 87532

City of Socorro Convention Center
New Construction
Results
Socorro, NM

Construction Manager Services
Results
Truth or Consequences, NM

Public Safety Secure Storage Facility Addition and Renovation
Renovation, Addition
Results
Less than $12,375,900 est. value
Santa Fe, NM

Reported 04/29/2020 12:00 AM
Project Title

Z--Annex 1502000 Facility Investment Annex 1602000 Electrical

Physical Address View project details and contacts
City, State (County) State-Wide: AZ, CO, NM, NV, UT
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Services to be performed under the resulting contract(s) may include the following Facilities Support (FSC) Services: 1) Annex 0100000 General Information 2) Annex 0200000 Management and Administration 3) Annex 1502000 – Facility Investment The Facility Investment requirements within this sub-annex primarily consist of infrastructure sustainment and minimal restoration and modernization work. Sustainment is the maintenance and repair necessary to keep an inventory of facilities and other assets in good working order. Restoration and modernization normally consists of major rehabilitation and capital improvements that is accomplished through other Navy programs. Some major repair, minor construction and stand-alone demolition may be accomplished as part of Facility Investment. 7) Annex 1602000 – Electrical The Electrical requirements within this sub-annex primarily consist of electrical infrastructure operation, sustainment and minimal restoration and modernization work. Operation of select electrical power generation plant and transmission and distribution systems to ensure all equipment and components operate safely, are fully functional and operational, 24 hours per day, 7 days a week. Sustainment is the maintenance and repair necessary to keep an inventory of electrical facilities and other supporting assets in good working order. Restoration and modernization normally consists of major rehabilitation and capital improvements that is accomplished through other Navy programs. Some major repair, minor construction and stand-alone demolition may be accomplished as part of Facility Investment. Maintenance requirements include, but are not limited to: Preventative Maintenance Corrective Maintenance Incidental Repairs Service Orders Emergency Service Orders Urgent Service Orders Routine Service Orders Grounds Maintenance Pest Control Instructions to Interested Parties.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents