Similar Projects
Last Updated | 03/10/2021 11:25 AM |
Project Title | Holton Road – Jackson Pike (SR 104) and Scioto Grove Metro Park Entrance |
Physical Address | View project details and contacts |
City, State (County) | Grove City, OH 43123 (Franklin County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,708,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The estimated costs of construction for the work: Base Bid: $ 1,708,000.00 Additional Bid 1: $ 335,000.00 1. Roadway widening along the east side of Jackson Pike (SR 104), removal of a portion of the existing Scioto Grove Metro Park entrance drive and construction of a new park entrance drive to align with the construction of a realigned portion of Holton Road. The proposed roadway improvements will include subgrade stabilization, full-depth asphalt pavement, asphalt shared-use path, concrete walks, and a new traffic signal. 2. Underground infrastructure including 12-inch storm sewers. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |