Similar Projects
Spot Patching / Pavement Repair - D06 SP FY21 Priority
Bidding
OH

Groveport Madison Asphalt and Concrete Replacement Phase 2
Bidding
OH

Paving Improvements
Post-Bid
Hilliard, OH 43228

Harlem Road Leisure Path Greensward Road to Dublin Granville Road
Post-Bid
Less than $340,000 est. value
New Albany, OH 43054

Fix It - Indefinite Quantity Contract - Asphalt Paving
Results
Less than $2,900,000 est. value
Columbus, OH

2019 Street Improvements
Results
Less than $805,000 est. value
Bexley, OH 43209

Resident Pad and Entrance Road Improvements Project
Bidding
Grove City, OH 43123

Prairie Township Sports Complex Entrance Phase 2 and Roadway Widening
Post-Bid
Less than $764,000 est. value
Columbus, OH 43085

District Pavement Improvements - Summer 2019
Results
Less than $417,621 est. value
Dublin, OH

Improvement of Toy Road, Swisher Road, Saltzgaber Road and Groveport Road Improvement Part 1 and 2
Bidding
Less than $2,739,346 est. value
Groveport, OH 43125

Avery Road and Rings Road/Cara Road Interim Intersection Improvement
Post-Bid
Dublin, OH

Intersection - IR 71 Ramp/Silver at Hudson
Results
Columbus, OH 43004

Hudson Street Utility Relocation
Bidding
Columbus, OH 43227

O`Shaughnessy Reservoir Asphalt Repairs
Post-Bid
Columbus, OH

Four Lane Resurfacing - IR-IR 670-03.88
Results
Columbus, Gahanna, OH 43230

Last Updated 03/10/2021 11:25 AM
Project Title

Holton Road – Jackson Pike (SR 104) and Scioto Grove Metro Park Entrance

Physical Address View project details and contacts
City, State (County) Grove City, OH 43123   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,708,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The estimated costs of construction for the work: Base Bid: $ 1,708,000.00 Additional Bid 1: $ 335,000.00 1. Roadway widening along the east side of Jackson Pike (SR 104), removal of a portion of the existing Scioto Grove Metro Park entrance drive and construction of a new park entrance drive to align with the construction of a realigned portion of Holton Road. The proposed roadway improvements will include subgrade stabilization, full-depth asphalt pavement, asphalt shared-use path, concrete walks, and a new traffic signal. 2. Underground infrastructure including 12-inch storm sewers.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents