Similar Projects
Reported | 11/09/2019 12:00 AM |
Project Title | LMIG 2019 Resurfacing of Sun Valley Subdivision |
Physical Address | View project details and contacts |
City, State (County) | East Point, GA (Fulton County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Providers for resurfacing of several local streets within the City collectively referred to as “Sun Valley Subdivision”. Project includes milling and inlay including correcting any subgrade deficiencies as required. The method of repair will be 2.5 inches of milling and inlay with 1.0 inch of Perma Pave (Flex) or equivalent asphalt plant mix, and 1.5 inches of 12.5 mm superpave for the entire surface of the pavement. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |