Reported 12/19/2019 12:00 AM
Project Title

Street Resurfacing Project - 121819

Physical Address View project details and contacts
City, State (County) College Park, GA 30337   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To provide professional contractual services for a street resurfacing project street resurfacing work for two (2) locations. Proposals for street resurfacing work for the two (2) locations with the following specification: A. For resurfacing, clean, tack each listed street with 1.5 inches thick layer of 12.5 mm super pave topping material, per each individual as identified street specification at a total lump sum cost. B. For milling, mill 1.5 inches existing pavement to restore proper grade and or transverse slope, for the 12.5 mm super pave topping material with lime, per each individual as identified per street list specification at a total lump sum cost. C. Estimate price to include, decal lanes, excel lanes, turning lanes, all intersections full width curb to curb, all Turnout, and any additional City Parking spaces, if applicable as identified street specification for the entire length of the project at a total lump sum cost. D. Restripe linear road markings, turn arrows, and stop bars, on each resurfacing project, this should be included in the lump sum price. Linear lines shall be painted with reflective beads. Thermo-plastic material to be used for all turns arrows, stop bars, and crosswalks, edge lines, words symbol, bike lanes. E. All warning and advance signs are to be in place within 24 hours, alerting motorist that street resurfacing activities will be take place begin, and end date at all times. Temporary reflective tape shall be use on each individual listed street. F. Have designated certify flagging personnel present on site at all-time actively directing traffic if needed. G. Contractor must provide a 24-hours clean-up service when each project is completed. H. All drainage structures within the limits of each project listed will be maintained throughout the duration of the project. Any debris that goes in drainage structures because of resurfacing or milling operation will be cleaned out at no additional cost to the City of College Park. I. City will locate and identify all manholes and water values J. An inspection will be done by the City of College Park Public Works Division Location: 1. Frontage Road 2. South Port Road

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents