Similar Projects
Reported | 12/19/2019 12:00 AM |
Project Title | Street Resurfacing Project - 121819 |
Physical Address | View project details and contacts |
City, State (County) | College Park, GA 30337 (Fulton County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFP) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | To provide professional contractual services for a street resurfacing project street resurfacing work for two (2) locations. Proposals for street resurfacing work for the two (2) locations with the following specification: A. For resurfacing, clean, tack each listed street with 1.5 inches thick layer of 12.5 mm super pave topping material, per each individual as identified street specification at a total lump sum cost. B. For milling, mill 1.5 inches existing pavement to restore proper grade and or transverse slope, for the 12.5 mm super pave topping material with lime, per each individual as identified per street list specification at a total lump sum cost. C. Estimate price to include, decal lanes, excel lanes, turning lanes, all intersections full width curb to curb, all Turnout, and any additional City Parking spaces, if applicable as identified street specification for the entire length of the project at a total lump sum cost. D. Restripe linear road markings, turn arrows, and stop bars, on each resurfacing project, this should be included in the lump sum price. Linear lines shall be painted with reflective beads. Thermo-plastic material to be used for all turns arrows, stop bars, and crosswalks, edge lines, words symbol, bike lanes. E. All warning and advance signs are to be in place within 24 hours, alerting motorist that street resurfacing activities will be take place begin, and end date at all times. Temporary reflective tape shall be use on each individual listed street. F. Have designated certify flagging personnel present on site at all-time actively directing traffic if needed. G. Contractor must provide a 24-hours clean-up service when each project is completed. H. All drainage structures within the limits of each project listed will be maintained throughout the duration of the project. Any debris that goes in drainage structures because of resurfacing or milling operation will be cleaned out at no additional cost to the City of College Park. I. City will locate and identify all manholes and water values J. An inspection will be done by the City of College Park Public Works Division Location: 1. Frontage Road 2. South Port Road |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |