Similar Projects
RFP - Tavares Square Project
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Tavares, FL 32778

The Vue at Clermont
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Clermont, FL 34711

Villa Pass
New Construction
Design
Mascotte, FL

Hilochee Modular Office
New Construction, Infrastructure
Bidding
$570,000 CJ est. value
Clermont, FL 34714

Woodlea Road Utilities Extension
New Construction, Infrastructure
Bidding
$400,000 CJ est. value
Tavares, FL 32778

Hyundai of Central Florida - Hyundai Genesis Dealership and Hyundai Service Expansion
Addition, Demolition, New Construction, Renovation, Infrastructure - 18,500 SF
Post-Bid
$2,130,000 CJ est. value
Clermont, FL 34711

Asphalt, Paving, Striping
Infrastructure
Post-Bid
$200,000 CJ est. value
Tavares, FL 32778

Lake May Reserve - Site 1 Improvements
Results
Eustis, FL 32736

Lake Denham Muck Farm Restoration
Infrastructure
Results
Leesburg, FL 34748

Panda Express - Sitework
New Construction
Construction
$2,266,630 est. value
Mount Dora, FL 32757

The Cottages at Heritage Grove Infrastructure
New Construction
Construction
$733,914 est. value
The Villages, FL 32159

Fire Station No. 34 - City of Mount Dora
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Mount Dora, FL 32757

Wekiva Ridge Residential Development
New Construction, Infrastructure
Pending Verification
$42,000,000 CJ est. value
Mount Dora, FL 32757

Mount Dora Hotel Center
New Construction, Infrastructure
Design
$40,000,000 CJ est. value
Mount Dora, FL 32757

Delivery and Installation of Clay at Various Lake County Parks
Infrastructure
Bidding
$188,000 CJ est. value
Tavares, FL 32778

Last Updated 08/18/2022 04:03 PM
Project Title

Turnpike Logistics Center

Physical Address View project details and contacts
City, State (County) Groveland, FL 34736   (Lake County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $63,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 977,000 square foot industrial building. As of August 18, 2022, this project is in the early planning stages, and has received construction plan approval from the City of Groveland. No building permits have been issued at this time. Information regarding the selection of an architect and general contractor has not been provided. A firm construction timeline has not been announced.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

977,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents