Similar Projects
Hertz Facility Demolition and Line of Sight Grading Project
Demolition, Infrastructure
Bidding
$9,267,036 est. value
Greensboro, NC

East Double Tree Beach Access
Infrastructure
Bidding
Atlantic Beach, NC

Wren Family Estates - Sitework
New Construction - 12,618 SF
Post-Bid
Siler City, NC 27344

Old Canal Street Re-Grading Project
Post-Bid
$800,000 est. value
Cornelius, NC 611352

Runway 23L Approach Clearing Project
Results
Greensboro, NC 27400

North Carolina National Guard - JFHQ Raleigh Helipad
Results
Less than $2,266,000 est. value
Raleigh, NC 27607

Transportation Impact Phase 2
Addition, Demolition - 12,112 SF
Construction
Emerald Isle, NC 28594

Coastal Walk Marketplace
New Construction - 103,500 SF
Construction
$10,000,000 CJ est. value
Shallotte, NC 28470

Goldsboro Business Campus - Phase I
Infrastructure
Bidding
Goldsboro, NC

CVS #7051 ADA
Renovation - 3,600 SF
Post-Bid
Wake Forest, NC 28078

DPS - Rockingham Youth Development Center- Grading and Utilities
Results
Rockingham, NC 28379

Red Springs High School Athletic Complex
Construction
$3,000,000 to $4,000,000 est. value
Red Springs, NC 28377

2019 CDBG-NR Park Improvements Contract No 1 - Site Improvements
Infrastructure
Bidding
Garland, NC

Site Improvements at Charlotte Water's Field Operations, Zone 1 and 2
Post-Bid
$1,500,000 est. value
Huntersville, NC 28078

Firing Range Site Remediation Project
Results
Clayton, NC

Last Updated 02/22/2022 11:57 AM
Project Title

Electrical Lineworker Overhead and Underground Training Facility

Physical Address View project details and contacts
City, State (County) Wilmington, NC   (New Hanover County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of site work including new gravel parking lot, stormwater improvements, utility connections, and landscaping. Building construction includes a new 3040 sf building. The building includes a pre-engineered steel frame, metal roof and siding, aluminum storefront, interior gypsum walls, plumbing, mechanical, and electrical systems.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents