Similar Projects
"Project Pumpkin" Distribution Center and Office Warehouse
New Construction - 673,186 SF
Design
$100,000,000 est. value
Huntley, IL 60142

Resurface
Infrastructure
Bidding
Sleepy Hollow, IL 60118

Edgelawn Bikeway Project Phase 3 Construction Engineering Services
Renovation
Post-Bid
Less than $408,000 est. value
Aurora, IL 60505

Central Division - Asphalt Paving Maintenance
Post-Bid

2020 Street Resurfacing Program
Results
Elgin, IL 60120

Reconstruct the Intersection of Anderson Road at Keslinger Road
Results
Elburn, IL 60119

Site Paving
Post-Bid
Elgin, IL 60120

5.6 Miles, Standard Overlay, ADA Improvements, Bridge Repairs, West Rd to Strom Dr in the City of Elgin
Results
Elgin, IL 60120

Asphalt
Term Contract
Post-Bid
Saint Charles, IL

Pavement Removal, Drainage Structures, Placement Of Subbase Granular Material, Hot-Mix Asphalt Pavement And Installation Of Thermoplastic Pavement Markings
Results
IL

Chip Seal Parking Lot and Roadway Improvements
Post-Bid
Elgin, Saint Charles, IL 60175

Granart Road Left Turn Lane
Results
Sugar Grove, IL 60554

2021 Road Program
Post-Bid
Sugar Grove, IL

2020 Roadway Program
Results
Elgin, IL 60120

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Last Updated 06/10/2021 09:42 AM
Project Title

Blackberry Township 2021 Road Maintenance

Physical Address View project details and contacts
City, State (County) IL   (Kane County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Resurfacing of various routes within Blackberry Township including Norris Road, Terrace Drive, Oakland Lane, West Burnham Lane, East Burnham Lane, East/West South Mill Creek Circle and South Mill Creek Drive. This work shall consist of the placement of Bituminous Materials (Tack Coat), Leveling Binder, Hot Mix Asphalt Surface Course, Hot Mix Asphalt Surface Removal, Short-term Pavement Marking, and all incidental, appurtenant and collateral work therefor (collectively the “project”) necessary to complete the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents