Similar Projects
Drawbridge Preventive Maintenance
Results
$20,000,001 to $50,000,000 est. value

Construction of Barnegat Branch Trail Phase IX, Admiral Avenue to S. Main Street and Herflicker Boulevard
Results
Less than $1,000,000 est. value
South Toms River, NJ 08757

Replacement of Main Street Bridge (Structure No. 1520-003), Main Street (C.R. 613) over Waretown Creek
Results
Less than $1,000,000 est. value
Waretown, NJ

Order for Professional Services No. P3692 Supervision of Construction Services for Contract No. P100.473, Bridge Repairs and Resurfacing, Milepost 0 to 126 (2020)
Results
$8,800,000 est. value
Woodbridge, NJ

Drawbridge Preventive Maintenance Contract
Results
$10,000,001 to $20,000,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Maintenance Movable Bridge and Tunnel Repair Contract
Results
$10,000,001 to $20,000,000 est. value

Maintenance Orphan Bridge Repair Contract 2020-1, Various Locations, Statewide
Results
Less than $5,000,000 est. value

Maintenance Job Order Contracting (JOC) Bridge Repairs, South – 2019
Results
$5,000,001 to $10,000,000 est. value

Bridge Repairs and Resurfacing; Milepost 0 to 126 (2021)
Results

Signature Bridge Preventive Maintenance Contract 2019-1
Results
$20,000,001 to $50,000,000 est. value

Replacement of Morris Boulevard Bridge
Results
$1,000,000 to $6,000,000 est. value
Stafford, NJ 08050

Drawbridge Preventive Maintenance Contract
Results
$10,000,001 to $20,000,000 est. value

Wright-Debow Road, Bridge Over Route 195
Results
Less than $5,000,000 est. value
Jackson, NJ 08527

Maintenance Movable Bridge and Tunnel Repair Contract, Statewide - 2021
Results
$10,000,001 to $20,000,000 est. value

Last Updated 11/19/2019 11:57 AM
Project Title

Replacement of Ridgeway Boulevard Bridge (Structure No. 1518-002)

Physical Address View project details and contacts
City, State (County) Toms River, NJ 08754   (Ocean County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of the complete replacement of the existing 3-span, 54' long concrete and timber bridge, with a single-span bridge consisting of precast/prestressed box beam superstructure with a concrete deck, supported by cast-in-place abutments founded on cast-in-place piles. All work to be done utilizing a full roadway closure.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents