Similar Projects
Dawson High Agriculture Center
New Construction
Conception
Dawsonville, GA

Resurgence Hall Charter School
Renovation - 18,740 SF
Design
$8,540,800 est. value
East Point, GA 30344

Harlem Middle School Addition
Addition
Bidding
$2,900,000 est. value
Harlem, GA 30814

New Middle School 3
New Construction
Bidding
GA

New West Laurens Middle School Campus and Middle School Athletic Complex
New Construction
Post-Bid
Less than $35,000,000 est. value
Dublin, GA 31021

Wood Wilkins Center at Lemon Street Project
Post-Bid
Marietta, GA 30060

New East Laurens High School Campus and Football Stadium - CM at Risk Services
New Construction
Results
Less than $34,000,000 est. value
Dublin, GA

Pebblebrook New Gym, Theater and Addition
New Construction, Addition, Demolition
Results
Less than $47,700,000 est. value
Mableton, GA

KIPP Atlanta Collegiate High School
Renovation, Addition - 127,391 SF
Construction
$10,000,000 est. value
Atlanta, GA 30314

General Contractor Services - Coralwood Diagnostic Center Additions and Renovations
Renovation, Addition
Construction
Less than $5,600,000 est. value
Tucker, GA

Atlanta Virtual Academy
Renovation
Bidding
Atlanta, GA 30318

New Campus for East Laurens High School
New Construction
Post-Bid
East Dublin, GA

Snelson Golden Middle Interior Renovations
Renovation
Results
Hinesville, GA 31313

Westside Middle School Additions, Renovations, and Modifications
Renovation, Addition
Construction
Less than $8,000,000 est. value
Winder, GA 30680

Modular Classroom Units
New Construction
Bidding
Bainbridge, GA

Reported 11/09/2021 11:17 AM
Project Title

Apalachee High School Phase IV Renovations

Physical Address View project details and contacts
City, State (County) Winder, GA 30680   (Barrow County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Complete as of August 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Proposal Packages The following Proposal Packages are available to be submitted – Coordinate with Instructions to Proposers: PP01 Selective Demolition PP02 Cabinetry PP03A Ceramic Tile Flooring PP03B Resilient & Carpet Flooring PP04 Acoustical Ceilings PP05 Gym Wood Flooring PP06 Painting

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents