Similar Projects
Midtown High-Rise Mixed-Use Development
New Construction
Conception
Phoenix, AZ 85012

Atari Hotel
New Construction
Conception
$65,000,000 to $75,000,000 est. value
Phoenix, AZ 85003

SOHO Scottsdale
New Construction - 23,000 SF
Design
Scottsdale, AZ 85260

Gentry on The Green
New Construction, Demolition - 6,406,150 SF
Design
$375,000,000 est. value
Scottsdale, AZ 85251

Precision Rentals
New Construction - 20,797 SF
Bidding
$1,663,760 est. value
Tolleson, AZ 85353

Demo White Box at Tatum Ridge
Renovation, Demolition - 2,355 SF
Post-Bid
$72,534 est. value
Phoenix, AZ 85028

Elliot Business Park - Spec Suite 110
Renovation - 78,996 SF
Post-Bid
$586,400 est. value
Tempe, AZ 85284

Foothills Village Apartments
Renovation - 5,822,433 SF
Results
Phoenix, AZ 85041

Rivulon Commons Buildings A and B
New Construction - 204,294 SF
Construction
$13,023,992 est. value
Gilbert, AZ 85297

The Abbey
Renovation - 53,130 SF
Construction
$7,810,110 est. value
Phoenix, AZ 85003

Amplify Exterior Renovations - Phase I
Renovation
Pending Verification
Chandler, AZ 85226

Amplify - Phase II
Renovation - 65,022 SF
Pending Verification
$415,000 est. value
Chandler, AZ 85226

Root Insurance - Claims and Call Center
Renovation - 38,000 SF
Conception
Chandler, AZ 85224

Papago Plaza - Retail Space and Parking Garage - SIte
New Construction, Demolition - 208,000 SF
Design
$11,000,000 to $16,000,000 est. value
Scottsdale, AZ 85257

Ironwood Seminary Office Pod
Renovation, Addition - 17,064 SF
Post-Bid
$200,000 est. value
Queen Creek, AZ 85140

Last Updated 08/10/2021 11:09 AM
Project Title

Zora Cottages at Encanto

Physical Address View project details and contacts
City, State (County) Phoenix, AZ 85035   (Maricopa County)
Category(s) Commercial, Entertainment/Recreation, Residential
Sub-Category(s) Fitness Center, Multi-Family Homes, Office
Contracting Method General Contractor to Subcontract.
Project Status Permitting, Construction Start Expected May 2021
Bids Due View project details and contacts
Estimated Value $4,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mixed Use.

Details

Office, New Construction, Multi-Family Homes, 2 Stories Above Grade, 378,210 SF New Construction, 109 Unit(s), 8.68 Acres, Fitness Center, New Construction, 164 Parking Spaces.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents