Similar Projects
HCA Acute Care Hospital
New Construction, Infrastructure
Conception
$41,900,000 CJ est. value
Wildwood, FL 32163

HCA Acute Care Hospital
New Construction, Infrastructure
Conception
$41,900,000 CJ est. value
Wildwood, FL 32163

Oxford Cottages
New Construction, Infrastructure - 131,150 SF
Design
$36,000,000 CJ est. value
Oxford, FL 34484

Oxford Cottages
New Construction, Infrastructure - 131,150 SF
Design
$36,000,000 CJ est. value
Oxford, FL 34484

Woodspring Suites / Oxford
New Construction, Infrastructure - 51,945 SF
Bidding
$15,700,000 CJ est. value
Oxford, FL 34484

Woodspring Suites / Oxford
New Construction, Infrastructure - 51,945 SF
Bidding
$15,700,000 CJ est. value
Oxford, FL 34484

C-466 at C-475N Roundabout Safety Project - Sumter County
Infrastructure
Post-Bid
$500,000 CJ est. value
Wildwood, FL 34785

C-466 at C-475N Roundabout Safety Project - Sumter County
Infrastructure
Post-Bid
$500,000 CJ est. value
Wildwood, FL 34785

Silicone Joint Sealer
Infrastructure
Results

Evaluation of Enhanced-Friction Asphalt Overlays and Surface Treatments
Infrastructure
Results

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Eden Villages
New Construction, Infrastructure
Construction
$36,800,000 CJ est. value
Wildwood, FL 34785

Cresswind Wildwood
New Construction, Infrastructure
Pending Verification
$273,000,000 CJ est. value
Wildwood, FL 34785

Cresswind Wildwood
New Construction, Infrastructure
Pending Verification
$273,000,000 CJ est. value
Wildwood, FL 34785

Freedom Fellowship Church Expansion
New Construction, Infrastructure - 19,000 SF
Conception
$6,200,000 CJ est. value
Wildwood, FL 34785

Last Updated 09/18/2023 09:07 AM
Project Title

Livano Wildwood

Physical Address View project details and contacts
City, State (County) Oxford, FL 34484   (Sumter County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $95,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of project is new construction of 5 multi residential building with 248 units and a clubhouse. As of September 18, 2023, Construction is underway. The Developer is Self-Performing. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

4 Stories Above Grade, New Construction, New Construction. 6,142 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents