Similar Projects
TMFR Station 37
New Construction
Design
Reno, NV

Unr - Install Replacement Heat Exchanger And Control Valves
Term Contract
Bidding
$100,000 to $200,000 est. value
Reno, NV 89512

HVAC System Renovation, Washoe County Armory Project
Alteration
Bidding
$1,600,000 est. value
Reno, NV 89506

Flood Warning Standpipe Repair & Reinstallation
Post-Bid

Air Duct Cleaning Set-Up
Term Contract
Post-Bid

J045--Chiller Comprehensive Service and Maintenance
Results

NV Ang Building 9 Chiller Replacement
Results
Reno, NV 89502

HVAC Services
Term Contract
Post-Bid
Reno, NV

UNR - Construct HVAC System at Fleischmann Agriculture Life Science Room 136 And 330
Results
$60,000 to $160,000 est. value
Reno, NV

2021 Sewer Maintenance, Repairs, & On-Call Services,
Term Contract
Results
$700,000 to $800,000 est. value
Reno, NV

Sierra Building Boiler Refurbishment
Term Contract
Results
$500,000 to $750,000 est. value
Reno, NV 89512

TMCC - Science Labs Fume Hoods
Term Contract
Results
Reno, NV 89557

UNR - Replace Make-Up Air Units Nell J. Redfield Building
Term Contract
Results
$50,000 to $150,000 est. value
Reno, NV 89503

UNR - Replace Auxiliary Rooftop Cooling Unit 2 at Mack Social Science
Alteration
Results
$60,000 to $120,000 est. value
Reno, NV

Elevator & Escalator Maintenance
Term Contract
Results
$225,000 est. value
Reno, NV

Reported 04/29/2022 12:00 AM
Project Title

UNR - Replace Pumps and Valves in Fleischmann Agriculture and Life Science Mechanical Room

Physical Address View project details and contacts
City, State (County) Reno, NV   (Washoe County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $55,000 to $115,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replace pumps and valves in Fleischmann Ag - Life Sciences North Penthouse Mechanical Room M403 that serve the HVAC system. Existing system supplies heating and cooling to Life Sciences wing of the building. Existing system to remain in service during construction to minimize downtime. Area contains asbestos. Mechanical and Electrical utility shutdowns to be coordinated with UNR construction manager and maintenance. Crane may be required for demo of equipment. Rooftop work.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents