Similar Projects
Submersible Well Pump Motors, Pump Assemblies and Start-Up Services
Term Contract
Bidding
FL

Removal, Repair and Re-Installation of Two Vertical Single End Suction Axial Flow Pumps and Right-Angle Gear Drives
Post-Bid
Coral Springs, FL

Transfer Pump Replacement
Post-Bid
Less than $1,735,000 est. value
Hallandale, FL 33009

Mechanical Integrity Testing for Deep Injection Wells
Results
Miramar, FL 33027

Supply and Delivery of Two (2) Split Case Horizontal Pumps
Results
Plantation, FL 33317

Maintenance, Repair and Parts for Tradewinds Brand Pumpset
Term Contract
Post-Bid
Davie, FL

Installation of Irrigation Pump System
Results
Miramar, FL 33025

Access Structure and Wetwell Rehabilitation - Term Contract
Term Contract
Results
Plantation, FL

Supply and Delivery of Well Pump
Results
Plantation, FL 33317

Raw Water Well #9
Results
Hallandale, FL 33009

Submersible Well Pump Motors, Pump Assemblies and Start-Up Services
Term Contract
Results
Less than $175,000 est. value
Fort Lauderdale, FL 33301

Irrigation Pump Control Upgrade to VFD
Results
Weston, FL

Pool Pumps
Results
Lauderhill, FL 33311

Reverse Osmosis Membrane Feed Pump and Motor
Results
Less than $275,000 est. value
Davie, FL 33314

Peele-Dixie Water Treatment Plant Injection Well Mechanical Integrity Test
Results
Fort Lauderdale, FL 33317

Last Updated 06/09/2021 09:24 AM
Project Title

Backwash Pump Replacement at 2A Water Treatment Plant

Physical Address View project details and contacts
City, State (County) Pompano Beach, FL 33064   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and dispose existing equipment listed and furnish, deliver and install one backwash pump, one silent globe check valve and connection fittings. This scope also includes demolish and restore existing discharge head reinforced concrete pad and all other accessories and materials needed to provide a completely functional backwash pump at the location listed above with the equipment

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents