Similar Projects
Miami Freedom Park & Soccer Village
New Construction - 1,000,000 SF
Conception
$1,000,000,000 est. value
Miami, FL

Sabal Palm Village at Flagler Trail
New Construction, Build-Out - 500,000 SF
Conception
$10,000,000 CJ est. value
Miami, FL

One Island Park
New Construction - 5,000 SF
Design
$10,000,000 CJ est. value
Miami Beach, FL

Indian Creek Apartments
New Construction, Renovation, Addition
Design
Miami Beach, FL

Design-Build Services for Miami International Airport (MIA) - Park 6 Employee Garage
New Construction
Bidding
Miami, FL 33126

Design-Build Services for Additional Elevators at Dadeland North Metrorail Station Parking Garage Project
Addition
Post-Bid
FL

Downtown Doral Lennar Residential
New Construction - 62,208 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Doral, FL 33166

Parking Garage Restoration
New Construction
Results
Aventura, FL

Parking Garage 7 Construction Project
New Construction
Results
$14,500,000 est. value
Coral Gables, FL 33134

The Watermark at Merrick Park
New Construction - 256,917 SF
Construction
$21,500,000 est. value
Coral Gables, FL 33146

River Landing Shops and Residences
New Construction - 1,600,000 SF
Construction
$425,000,000 est. value
Hialeah, Miami, FL 33010

Stellar Golden Glades
New Construction, Demolition
Conception
$1,000,000 to $5,000,000 CJ est. value
Miami, FL

Varadero
New Construction - 2,456,798 SF
Design
$10,000,000 CJ est. value
Sunny Isles, FL

Construction of Public - Private Partnership (Government Complex, including Miami-Dade County Fire Station No. 27, and other Private Improvements and Services)
New Construction - 114,356 SF
Post-Bid
$4,670,000 est. value
Miami, FL 33138

Markers Grove Isle
New Construction, Renovation - 126,350 SF
Construction
$10,000,000 est. value
Coconut Grove, FL

Last Updated 02/15/2022 02:47 PM
Project Title

C1LZ--MINOR (P/N 546-132) Construct New 500 Space Expandable Parking Garage Design - Miami VAMC

Physical Address View project details and contacts
City, State (County) Miami, FL 33136   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $13,390,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF DESIGN This project will construct a parking garage on the main medical campus at the Bruce W. Carter Miami VA Medical Center. The garage will be 500 new spaces not counting the existing spaces on current asphalt and constructed in such a manner that can expand to accommodate additional floors for future parking. The existing ground parking shall be renovated with new asphalt, parking stripes, and stops. This will include the design construction, lighting, necessary security measures, cameras, lighting, fencing, anti-suicide barriers, pavement markings, access control systems including camera termination to the police service so that the feeds are viewable from the existing police monitoring station. The construction will take place of government owned land at the Medical Center Campus or auxiliary parking area. The garage shall also include electric vehicle charging stations with industry standard electrical connections. Proprietary brand specific alternate connections may also be used but must be clearly labeled. Each station should have the ability to charge as many makes and models commonly sold in the United States. The A-E shall be professionally licensed in any state in the United States, with the exception of the Structural Engineer, who must be professionally licensed in the state of Florida. The A-E is responsible for all services to complete the deliverables listed in the A-E Scope of Work (SOW) (546-132 AE Statement of Task_Rev 01-12-2021). Please note that the 180 calendar day period of performance for the design completion begins with the issuance of the Notice of Award (NOA) and that a Notice to Proceed (NTP) will not be issued for the completion of a design project. The construction period services will be an option items that will be exercised after the award of the construction project. The period of performance for construction period services will match the period of performance for the construction project.

Details

Parking Garage, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents