Similar Projects
Nall 58
New Construction, Infrastructure
Design
$30,000,000 est. value
Mission, KS 66202

Nall 58
New Construction, Infrastructure
Design
$30,000,000 est. value
Mission, KS 66202

IH0035W - Crack Seal
Infrastructure
Bidding
$133,794 est. value
Olathe, KS 66051

Grading and Surfacing
Infrastructure
Bidding
$3,000,000 est. value
Westwood, KS 66205

Moonlight Sidewalk
Post-Bid
Gardner, KS

Mill Creek Trail Improvements 2021
Infrastructure
Post-Bid
Lenexa, KS

Road Construction, Moonlight Road
Results
KS

Road Construction, East of Mission Road
Results
KS

Coca Cola Trailer Parking
New Construction
Pending Verification
Lenexa, KS

2022 Windsor Park Tennis and Trail
Renovation, Infrastructure
Bidding
$2,000,000 est. value
Prairie Village, KS 66208

2021 Street Maintenance Program
Infrastructure
Post-Bid
Edgerton, KS

2021 Cars 50th Street and Stateline Road
Results
$100,365 est. value
Westwood Hills, KS

Signal and Sidewalk ADA Improvement Project
Infrastructure
Post-Bid
Shawnee, KS

2021 Asphalt Overlay Program
Results
KS

Safe Routes to Schools Program
Infrastructure
Post-Bid
Olathe, KS

Reported 07/09/2022 12:00 AM
Project Title

2022 CIP Street Maintenance

Physical Address View project details and contacts
City, State (County) Fairway, KS 66205   (Johnson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Cold milling and asphalt overlay of the roadways on Lockton Lane, Brookridge Drive, Sheridan Drive, Howe Drive and Glenfield Drive, spot repair of curb and gutter on all street, and pavement base repair as required.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents