Similar Projects
Law Building Renovation
New Construction
Bidding
$33,000,000 est. value
Atlanta, GA

Exterior Renovation Of Clarkston Campus
Renovation
Bidding

Alpharetta Campus Dry Labs
New Construction
Post-Bid
$850,000 est. value
Atlanta, GA 30302

Energy Efficiency and Infrastructure Upgrades
Renovation
Post-Bid
$2,848,860 est. value
Atlanta, GA 30310

Task Order Contract Services
Results
Atlanta, GA 30302

Howey Physics Building Switchboard Replacement
Results
Atlanta, GA 30332

SCAD Arts & Sciences Building
New Construction
Construction
Atlanta, GA 30309

Cherry Emerson Grad Office & Lobby Renovation
Renovation
Construction
Atlanta, GA 30313

The Metropolitan at Atlanta Student Housing Community
New Construction
Pending Verification
Atlanta, GA 30302

GTRI 1838 B12 Core and Shell Interior Build-Out
Build-Out - 50,000 SF
Post-Bid
$25,000,000 est. value
Atlanta, GA 30332

Stem Renovations and Furniture Decatur Campus SC2140
Results
Less than $98,679 est. value
Atlanta, GA

FY-2023 General Contractor Task Order Services
New Construction
Post-Bid
Less than $5,000,000 est. value
Atlanta, GA 31136

Natural Science Center Lab 360 BSL -3 Renovation
Renovation - 1,800 SF
Results
Less than $1,543,000 est. value
Atlanta, GA 30303

General Contractor Task Order Services FY 2022
Results
Less than $2,500,000 est. value
Atlanta, GA

FY 21 MRRF ADA Projects
Renovation
Results
$540,000 est. value
Atlanta, GA 30302

Last Updated 02/22/2022 10:47 AM
Project Title

Coliseum Annex Level 2 and 3 Renovation

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30332   (Fulton County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,016,087
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will primarily focus on the interior renovation of the second floor (10,000 SF – which does not include the practice gymnasium) which houses the Men’s and Women’s Track Program spaces, including: student-athlete locker rooms, coaches’ locker rooms, training room, storage, and support spaces. The renovation will refresh the student-athlete locker rooms, which will include expanded shower and restroom areas and added dedicated shoedrying rooms to each. The existing front lobby and storage rooms along the south (8th Street) facade will be reconfigured to create an expanded lobby / student lounge with a new nutrition bar. Daylighting will be enhanced by exposing the existing windows along the south facade. An expanded training facility with an enhanced hydrotherapy area will be located in the new space. The existing training room will be reconfigured to accommodate new coaches’ locker rooms. In addition, a new egress door with exterior stairs will be added at the west exterior wall to lead from the extended north interior corridor into the courtyard between the Annex building and the ACC Network building to improve operations. Additionally, a portion of the third floor will be renovated for officials and visiting teams’ locker rooms. These locker rooms will ensure GT improves the experience provided to guests, but will employ minimal amenities to keep the cost low. There will be additional improvements to the third floor space that will facilitate other GTAA projects relative to swing space and other athletics needs. This renewal will allow current and future student-athletes to succeed both in academics and athletics. This project will benefit the Track & Field programs through refreshed facilities to enhance athlete performance and recovery, to facilitate a culture of success, and to serve as a backdrop for successful recruiting. The proposed renovated area totals approximately 12,500 square feet.

Details

1 College/University, 2 Stories Above Grade, 12,500 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents