Last Updated | 04/06/2023 04:09 PM |
Project Title | I-5, Mounts Road to Steilacoom - DuPont Road - Corridor Improvements |
Physical Address | View project details and contacts |
City, State (County) | Fife, WA 98424 (Pierce County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $188,478,895 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of April 6th an awarded contractor has been identified. Construction is anticipated to begin in August 2023. The project provides for the improvement of I-5, from milepost 116.55 to 120.94, Pierce County. I-5 will be widened to accommodate four thru-lanes in each direction. Auxiliary lanes will be added to both directions of I-5 between the Center Drive and Steilacoom-DuPont Road interchanges. The left lane in both directions of I-5 will be striped as a high occupancy vehicle (HOV) lane. The Steilacoom-DuPont Road interchange will be reconstructed to provide grade separation over the Sound Transit railroad and maintain access to the Joint Base Lewis-McChord (JBLM) DuPont Gate. A shared use path within the new interchange will provide non-motorized connectivity between the JBLM DuPont Gate and the City of DuPont. A roundabout will connect Steilacoom-DuPont Road and Wilmington Drive with the reconstructed interchange. Improvements within the JBLM secure perimeter include lowering Pendleton Avenue under I-5 and the Sound Transit railroad bridge, landscape restoration within the Memorial Arboretum, constructing a new historical marker and vehicle pullout along Pendleton Avenue, and two noise walls. Other major work includes utility relocation, earthwork grading, bridge construction and demolition, retaining walls, storm water management facilities, concrete barrier, guardrail, hot mix asphalt (HMA) paving, illumination, traffic signals, intelligent transportation systems (ITS), signing, and overhead sign structures. County Pierce County Contact Bill Elliott Project Engineer bill.elliott@wsdot.wa.gov 360-357-2735 A state project with a 26% voluntary minority/small/veteran/women business enterprise goal The project provides for the improvement of I-5, from milepost 116.55 to 120.94, Pierce County. I-5 will be widened to accommodate four thru-lanes in each direction. Auxiliary lanes will be added to both directions of I-5 between the Center Drive and Steilacoom-DuPont Road interchanges. The left lane in both directions of I-5 will be striped as a high occupancy vehicle (HOV) lane. The Steilacoom-DuPont Road interchange will be reconstructed to provide grade separation over the Sound Transit railroad and maintain access to the Joint Base Lewis-McChord (JBLM) DuPont Gate. A shared use path within the new interchange will provide non-motorized connectivity between the JBLM DuPont Gate and the City of DuPont. A roundabout will connect Steilacoom-DuPont Road and Wilmington Drive with the reconstructed interchange. Improvements within the JBLM secure perimeter include lowering Pendleton Avenue under I-5 and the Sound Transit railroad bridge, landscape restoration within the Memorial Arboretum, constructing a new historical marker and vehicle pullout along Pendleton Avenue, and two noise walls. Other major work includes utility relocation, earthwork grading, bridge construction and demolition, retaining walls, storm water management facilities, concrete barrier, guardrail, hot mix asphalt (HMA) paving, illumination, traffic signals, intelligent transportation systems (ITS), signing, and overhead sign structures. Estimated value: $165,000,000 - $195,000,000 WADOT - I-5, Mounts Rd to Steilacoom-DuPont Rd - Corridor Improvements |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |