Similar Projects
Mary Bridge Children's Hospital
New Construction
Design
Tacoma, WA

Northwestern Division Regional $115M Section 8(A) SB Set-Aside IDIQ MATOC
New Construction
Design

I-5, Mounts Rd To Steilacoom-Dupont Rd - Corridor Improvements
Infrastructure
Bidding
$165,000,000 to $195,000,000 est. value
WA

1-5 South 56th Street Interchange ADA Compliance
Infrastructure
Bidding
$978,000 est. value
Tacoma, WA 98417

Repair Building 09175, Permanent Party UH
New Construction
Post-Bid
WA

20th Street Preservation
Infrastructure
Post-Bid
Fife, WA 98424

SR 167,I-5 to SR 509 - New Expressway
Infrastructure
Results
$325,000,000 to $375,000,000 est. value
WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

Puyallup Avenue Transit - Street Improvements
Infrastructure
Results
$100,000 est. value
Tacoma, WA

Right Abutment Access Road Remidiation
Alteration
Results
$100,000 to $120,000 est. value
Shelton, Tacoma, WA

Transfer Lead Upgrades
Infrastructure
Results
$251,000 est. value
WA

92nd Avenue East/224th Street East
Alteration
Results
$2,700,000 to $4,000,000 est. value
WA

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

CRP 5736 Canyon Road East - 400 ft. n/o of 84th St E to 72nd Street East
Infrastructure
Results
$6,000,000 to $8,000,000 est. value
Tacoma, WA 98417

Sumner Buckley Highway East 258Th Avenue East to West Mason Avenue
Infrastructure
Results
$1,000,000 to $1,600,000 est. value
Buckley, Tacoma, WA 98321

Reported 02/01/2022 12:00 AM
Project Title

ASOG Complex

Physical Address View project details and contacts
City, State (County) Camp Murray, WA   (Pierce County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Military Facility, Parking Garage, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construct Air Support Group Operations Complex: contract to provide non-personal construction services to construct an Air Support Group Operations Complex located at Camp Murray. - Project includes construction of a conventional shallow foundation with special reinforced masonry shear wall with brick and metal panel veneer main facility. - Adjacent construction will include the construction of several cantilever, concrete slab on grade covered parking structures - Construction of vehicle parking, and roadway extension of 41st Division Way

Details

,, 71,600 SF - 1 Military Facility, Approximately 56,600 SF New Construction, Building, 1 Parking Garage, Approximately 15,000 SF New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents