Similar Projects
Convention Center Expansion - 6020.119 - City of Austin
Addition, Infrastructure - 321,700 SF
Conception
$14,234,396 CJ est. value
Austin, TX 78701

Slaughter Lane - West of S Congress to Bluff Springs Rd - 11890.011 - City of Austin
Infrastructure
Conception
$4,156,730 CJ est. value
Austin, TX 78748

Remedial Repair Attoyac Bayou Site 21
Infrastructure
Design
$250,000 CJ est. value
Nacogdoches, TX 75961

Four Hands Mixed Use
Renovation - 40,000 SF
Design
$907,471 est. value
Austin, TX 78744

William Cannon Drive Phase 3
Infrastructure
Post-Bid
$370,000 CJ est. value
Austin, TX 78745

Substation Steel Structure
New Construction
Post-Bid
Austin, TX

Hydro Excavation Services
Infrastructure
Results
Austin, TX

Colony Park Sustainable Community Boulders Project
Infrastructure
Results
Austin, TX 78724

Capitol Complex, Phase 2
New Construction, Infrastructure
Construction
$225,000,000 CJ est. value
Austin, TX 78701

BCRUA Phase 2 Raw Water Delivery System
Infrastructure
Construction
$224,786,835 CJ est. value
Cedar Park, TX 78613

Dutch Bros Coffee TX1202 / Austin
New Construction, Infrastructure - 871 SF
Pending Verification
$250,000 CJ est. value
Austin, TX 78754

Engineering Discovery Building - CMAR
New Construction, Infrastructure
Pending Verification
$169,650,000 CJ est. value
Austin, TX 78712

Shoal Creek - MoPac/Steck Water Quality Ponds Retrofit - 5282.156 - City Of Austin
Alteration
Conception
Less than $695,000 est. value
Austin, TX 78799

Precision Overhead Door
Renovation - 7,850 SF
Design
$192,000 est. value
Austin, TX 78721

Lake Travis High School Phase 2 Site Improvements
Infrastructure
Post-Bid
Austin, TX 78738

Last Updated 06/12/2023 01:05 PM
Project Title

Travis County Correctional Complex New Evidence Warehouse

Physical Address View project details and contacts
City, State (County) Del Valle, TX 78617   (Travis County)
Category(s) Commercial, Government/Public, Heavy and Highway
Sub-Category(s) Prison/Jail, Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $5,900,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Q & A deadline: Jul 18, 2022 11:00:00 AM EDT Liquidated damages: 1300.00 Quantity: 1 lump sum Please Enter The Lump Sum In Both Numbers And Written Out In Words In The Spaces Provided For The Travis County Correctional Complex New Evidence Warehouse Project PN - EVWH-01-20R-4N, R1005246.00, 1005246, 2008.000

Details

18,800 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Door Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents