Similar Projects
Last Updated | 03/27/2021 12:13 AM |
Project Title | The Grading, Drainage, Signals and Paving on U.S. 11 (U.S. 70, S.R. 1) at the Intersection of North Watt Road and South Watt Road in Farragut (L.M. 0.20) |
Physical Address | View project details and contacts |
City, State (County) | Farragut, TN (Knox County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project No. Stp-Sip/m-1(353), 47956-3227-94 (Pin 122323.00) The Grading, Drainage, Signals And Paving On u.s. 11 (u.s. 70, s.r. 1) At The Intersection Of North Watt Road And South Watt Road In Farragut (l.m. 0.20). Project Length - 0.095 Miles. 105-01 Construction Stakes, Lines And Grades (1) Ls 203-01 Road & Drainage Excavation (Unclassified) 1,439.000 c.y. 203-06 Water 21.000 m.g. 203-07 Furnishing & Spreading Topsoil 30.000 c.y. 209-05 Sediment Removal 1.000 c.y. 209-08.02 Temporary Silt Fence (With Backing) 182.000 l.f. 209-08.03 Temporary Silt Fence (Without Backing) 50.000 l.f. 209-08.08 Enhanced Rock Check Dam 1.000 Each 209-09.41 Curb Inlet Protection (Type 2) 12.000 Each 209-09.43 Curb Inlet Protection (Type 4) 8.000 Each 209-40.41 Catch Basin Filter Assembly(Type 1) 2.000 Each 303-01 Mineral Aggregate, Type a Base, Grading d 472.000 Ton 303-10.01 Mineral Aggregate (Size 57) 11.000 Ton 307-01.01 Asphalt Concrete Mix (Pg64-22) (Bpmb-Hm) Grading a 78.000 Ton 307-01.21 Asp. Conc. Mix(Pg70-22) (Bpmb-Hm) Gr. a-s 77.000 Ton 307-02.01 Asphalt Concrete Mix (Pg70-22) (Bpmb-Hm) Grading a 77.000 Ton 307-02.08 Asphalt Concrete Mix (Pg70-22) (Bpmb-Hm) Grading b-m2 51.000 Ton 402-01 Bituminous Material For Prime Coat (Pc) 1.000 Ton 402-02 Aggregate For Cover Material (Pc) 3.000 Ton 403-01 Bituminous Material For Tack Coat (Tc) 4.000 Ton 411-01.10 Acs Mix(Pg64-22) Grading d 59.000 Ton 411-02.10 Acs Mix(Pg70-22) Grading d 636.000 Ton 415-01.02 Cold Planing Bituminous Pavement 9,113.000 s.y. 607-03.02 18" Concrete Pipe Culvert (Class Iii) 361.000 l.f. 610-11.05 Plastic Pipe Drains (12") 5.000 l.f. 611-01.01 Manholes, 0' - 4' Depth 1.000 Each 611-01.21 Rework Manhole 1.000 Each 611-07.01 Class a Concrete (Pipe Endwalls) 2.000 c.y. 611-07.02 Steel Bar Reinforcement (Pipe Endwalls) 124.000 Lb. 611-09.03 Capping Existing Catchbasin 2.000 Each 611-12.01 Catch Basins, Type 12, 0' - 4' Depth 4.000 Each 611-12.02 Catch Basins, Type 12, > 4' - 8' Depth 3.000 Each 611-38.01 Catch Basins, Type 38, 0' - 4' Depth 1.000 Each 701-01.01 Concrete Sidewalk (4 ") 5,589.000 s.f. 701-02 Concrete Driveway 488.000 s.f. 701-02.03 Concrete Curb Ramp 869.000 s.f. 702-01 Concrete Curb 17.000 c.y. 702-03 Concrete Combined Curb & Gutter 84.000 c.y. 703-02 Cement Concrete Ditch Paving (Reinforced) 4.000 c.y. 705-08.51 Portable Impact Attenuator Nchrp350 Tl-3 2.000 Each 707-08.11 High-Visibility Construction Fence 235.000 l.f. 709-05.05 Machined Rip-Rap (Class a-3) 47.000 Ton 709-05.06 Machined Rip-Rap (Class a-1) 13.000 Ton 710-02 Aggregate Underdrains (With Pipe) 686.000 l.f. 712-01 Traffic Control (1) Ls 712-02.02 Interconnected Portable Barrier Rail 200.000 l.f. 712-04.01 Flexible Drums (Channelizing) 70.000 Each 712-04.50 Barrier Rail Delineator 9.000 Each 712-06 Signs (Construction) 208.000 s.f. 712-08.03 Arrow Board (Type c) 2.000 Each 713-11.02 Perforated/Knockout Square Tube Post 26.000 Lb. 713-13.02 Flat Sheet Aluminum Signs (0.080" Thick) 4.000 s.f. 716-02.03 Plastic Pavement Marking (Cross-Walk) 253.000 l.f. 716-02.05 Plastic Pavement Marking (Stop Line) 140.000 l.f. 716-02.06 Plastic Pavement Marking (Turn Lane Arrow) 11.000 Each 716-04.01 Plastic Pavement Marking (Straight-Turn Arrow) 1.000 Each 716-05.01 Painted Pavement Marking (4" Line) 2.000 l.m. 716-05.02 Painted Pavement Marking (8" Barrier Line) 500.000 l.f. 716-05.49 Painted Pavement Markings(8" Line) 1.000 l.m. 716-08.30 Hydroblast Removal Of Pavement Marking (Line) 1.000 l.m. 717-01 Mobilization (1) Ls 730-02.09 Signal Head Assembly (130 With Backplate) 6.000 Each 730-02.17 Signal Head Assembly (150 a2h With Backplate) 2.000 Each 730-02.30 Signal Head Assembly (Description) (140 a 4f With Backplate) 4.000 Each 730-03.21 Install Pull Box (Type b) 13.000 Each 730-05.01 Electrical Service Connection 1.000 Each 730-08.01 Signal Cable - 3 Conductor 700.000 l.f. 730-08.02 Signal Cable - 5 Conductor 1,400.000 l.f. 730-08.03 Signal Cable - 7 Conductor 1,900.000 l.f. 730-12.02 Conduit 2" Diameter (Pvc) 800.000 l.f. 730-12.16 Conduit (Description) (2" Diameter Pvc Schedule 80) 900.000 l.f. 730-13.08 Vehicle Detector (Description) (Radar - Stop Line) 4.000 Each 730-13.09 Vehicle Detector (Description) (Radar - Advance) 2.000 Each 730-13.10 Vehicle Detector (Description) (Emergency Premption) 4.000 Each 730-15.32 Cabinet (Eight Phase Base Mounted) 1.000 Each 730-16.02 Eight Phase Actuated Controller 1.000 Each 730-23.30 Pedestal Pole (Description) (10 Feet Pedestrian) 8.000 Each 730-23.36 Cantilever Signal Support (Description) (1 Arm @ 60 Feet) 2.000 Each 730-23.37 Cantilever Signal Support (Description) (1 Arm @ 45 Feet) 1.000 Each 730-23.38 Cantilever Signal Support (Description) (1 Arm @ 50 Feet) 1.000 Each 730-26.11 Countdown Ped Sgnl Head w/Audible Push Button & 15in Sign 8.000 Each 730-35.06 Battery Back-Up And Power Conditioner 1.000 Each 740-10.03 Geotextile (Type Iii)(Erosion Control) 190.000 s.y. 801-01 Seeding (With Mulch) 3.000 Unit 801-03 Water (Seeding & Sodding) 18.000 m.g. 803-01 Sodding (New Sod) 1,760.000 s.y. 791-02.02 2in Mdpe Gas Main 40.000 l.f. 791-02.06 8in Mdpe Gas Main 1,050.000 l.f. 791-02.27 <=2 In Pe Temp. By-Pass For Tie-In (1) Ls 791-04.04 Hdd 4in Pe Pipe - Unconsolidated 60.000 l.f. 791-04.07 Hdd 12in Pe Pipe - Unconsolidated 75.000 l.f. 791-06.02 Connect To 2in Ex. Pe Main 1.000 Each 791-06.04 Connect To 6in Ex. Pe Main 1.000 Each 791-06.05 Connect To 8in Ex. Pe Main 3.000 Each 791-06.34 Connect To 8in Ex. Stl Main w/ Stopple 1.000 Each 791-07.04 8in Pe Gas Valve Assembly 3.000 Each 791-08.03 1in Service Assembly 4.000 Each 791-08.33 1in Hdpe Service Pipe 100.000 l.f. 791-08.41 Gas Main Removal 1,420.000 l.f. 791-09.05 Restore Asphalt 100.000 s.y. 791-09.06 Restore Concrete 10.000 s.y. 791-10.04 Retire In Place 2in Serv Cut & Plug 2.000 Each 791-10.06 Retire In Place 6in Serv Cut & Plug 1.000 Each 791-10.07 Retire In Place 8in Serv Cut & Plug 2.000 Each |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |