Similar Projects
Concrete Repairs
Infrastructure
Bidding
$300,000 est. value
Carpentersville, IL

2022 Street Improvements
Infrastructure
Bidding
$1,308,868 est. value
West Dundee, IL

Asphalt
Term Contract
Post-Bid
Saint Charles, IL

Roadway Resurfacing
Post-Bid
Saint Charles, IL

Bolz Road Reconstruction from Amarillo Drive to Kennedy Drive
Results
Carpentersville, IL 60110

Haines Building - Asphalt Paving Replacement
Results
Saint Charles, IL

Amazon Distribution Center and Office Warehouse
New Construction - 673,186 SF
Construction
$100,000,000 est. value
Huntley, IL 60142

VNA Health Care Parking Area
Alteration
Construction
Aurora, IL 60506

2021 Eastside Resurfacing
Infrastructure
Post-Bid
Carpentersville, IL

2021 MFT and Infrastructure Road Program
Results
Less than $2,965,600 est. value

2021 Street Resurfacing and Sidewalk Program
Infrastructure
Post-Bid
Batavia, IL

2020-2021 Crackfill Streets
Results
Less than $79,560 est. value
North Aurora, IL

2021 Northeast Area Resurfacing
Infrastructure
Post-Bid
Elgin, IL

Fire Station No. 5 Driveway Improvements
Results
Less than $192,655 est. value
Aurora, IL 60505

Asphalt
Infrastructure
Post-Bid
Elburn, IL 60119

Last Updated 06/17/2022 12:16 AM
Project Title

Application of Fiberized Crackfilling Material and Seal Coating Parking Lots

Physical Address View project details and contacts
City, State (County) Batavia, IL   (Kane County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project Is Located at Various Locations in the City of Batavia. See Location Map for Specific Locations and Limits. The Proposed Improvement Will Include Traffic Control and Protection and the Application of Fiberized Crackfilling Material and Sealcoating Parking Lots. The Fiberized Crackfilling Material Work Consists of Cleaning and Sealing of Any Cracks, Voids or Joints 2" in Width or Less With Asphalt Cement Reinforced by Polypropylene Fibers.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents