Similar Projects
Last Updated | 02/28/2022 07:51 AM |
Project Title | 2021 MFT and Infrastructure Road Program |
Physical Address | View project details and contacts |
City, State (County) | (Kane, Kendall Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,965,600 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Consisting of pavement patching, pavement milling, resurfacing, curb and gutter removal and replacement, sidewalk removal and replacement, structure adjustments, pavement markings, crack sealing and all other ancillary work required to complete the project. This project consists of Partial Depth Patching (Special) (1765.5 SY), Class D Patches (1320.3 SY), HMA Surface Removal (117,770 SY), HMA Binder Course, IL-9.5, N50 (10,220 Ton), HMA Surface Course, Mix "D", N50 (10,317 Ton), Combination Concrete Curb & Gutter Removal & Replacement (6169 LF), Sidewalk Removal (48,075 SF), Portland Cement Concrete Sidewalk, 5" (47,351 SF), Structure Adjustments (253 EA), Frame and Grates (213 EA), Thermoplastic Pavement Markings - Line (12,630 LF), Sign Panel - Type 1 (355.3 SF), Telescoping Steel Sign Support (720 LF), HMA Driveway Removal and Replacement (951.7 SY), Restoration (3050 SY), Traffic Control and Protection, Non-Special Waste Disposal (20 CY), Crack Routing (105,000 LF), Crack Filling (35,000 LB), Emulsified Maltene-Based Rejuvenator (132,885 SY). |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |