Similar Projects
Gulf Intracoastal Waterway Fy19 Corpus Christi to Port Isabel and the Channel to Harlington
Design
$5,000,000 to $10,000,000 est. value
Corpus Christi, TX

FY20 GIWW Rollover to Causeway Maintenance Dredging - Pipeline Dredging
Design
$5,000,000 to $10,000,000 est. value

Dredge Boat Basin USCG Station Houston, TX
Bidding
$250,000 to $500,000 est. value
Houston, TX

Freshwater Mussel Survey and Aquatic Species Resource Relocation Services
Term Contract
Bidding
Waco, TX

SNWW, Texas, River Channel Anchorage and Turning Basin
Post-Bid
$10,000,000 to $25,000,000 est. value
TX

Annual Dredging Services
Term Contract
Post-Bid
Corpus Christi, TX 78403

Indefinite Delivery/Indefinite Quantity (IDIQ), Multiple Award Task Order Contracts (MATOC) for Rapid Response Hopper Dredging Due to Unanticipated Shoaling and Shore Protection Projects in Multiple Locations within the Boundaries of the Galveston District
Results
$3,000 to $25,000,000 est. value
Corpus Christi, Freeport, Galveston, Matagorda, TX 77550

Indefinite Delivery/Indefinite Quantity (IDIQ), Multiple Award Task Order Contracts (MATOC) for Rapid Response Hopper Dredging Due to Unanticipated Shoaling and Shore Protection Projects in Multiple Locations within the Boundaries of the Galveston District
Results
$3,000 to $25,000,000 est. value
Corpus Christi, Freeport, Galveston, Matagorda, TX 77550

Fy21 Houston Ship Channel Exxon to Carpenters - Dredging
Design
$5,000,000 to $10,000,000 est. value
Houston, TX

Ship Dock Basin Maintenance Dredging
Bidding
Galveston, TX

Freeport Harbor, Texas, Channel Improvement Project, Reach 3 Lower Stauffer Channel in Brazoria County, Texas, Pipeline Dredging.
Post-Bid
$10,000,000 to $25,000,000 est. value
TX

Mouth of Colorado Maintenance Dredging
Results
$5,000,000 to $10,000,000 est. value
TX

FY 21 Pipeline Dredging Deep Draft Houston Ship Channel - Greens Bayou to Sims Bayou Harris, County, Texa
Design
$5,000,000 to $10,000,000 est. value
TX

Marina Breakwater at McGee Beach Improvements and Boat Basin Dredging
Bidding
Corpus Christi, TX

Single Award Task Order Contract (SATOC) for Mechanical Dredging for the US Army Corps of Engineers, Galveston District and the Southwestern Division.
Post-Bid
$5,000,000 to $10,000,000 est. value
Galveston, TX

Last Updated 12/22/2020 03:55 PM
Project Title

Gulf Intracoastal Waterway, Texas, Freeport Harbor to Upper Matagorda Bay in Brazoria and Matagorda Counties, Texas, Pipeline Dredging.

Physical Address View project details and contacts
City, State (County) TX   (Matagorda County)
Category(s) Heavy and Highway
Sub-Category(s) Dredging
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Information: The work consists of pipeline dredging Freeport to Upper Matagorda Bay, Texas including the San Bernard and Colorado River channels. Project is for shallow-draft pipeline dredging of the Gulf Intracoastal Waterway (GIWW) in Brazoria and Matagorda Counties with two Options for additional dredging of the GIWW San Bernard River channel and the GIWW Colorado River Channel. Contractor should expect and be able to perform dredging operations in strong currents / riverine flows in and around the Brazos River, the Colorado River, San Bernard River and vicinity of GIWW / Caney Creek intersections. In addition to being able to dredge in locations with strong currents / riverine flows contractor must have dredge plant capable of efficient removal of shoals in areas of rapid / high sediment deposition. Sediment composition is primarily silty but contractor should expect to encounter hard-packed sand in vicinity of Caney Creek and Colorado River Crossing. Schedule 1: dredging of approximately fourteen (14) sections within the GIWW and GIWW Channel to Palacios. Estimated quantity: 1,140,000 CY. Placement Areas include: upland confined, open water, surf zone and river discharge. Completion time, 230 calendar days. Option 1: dredging of four (4) sections within the GIWW San Bernard River Channel between Sta. 2+600 and Sta. 84+600. Estimated quantity: 30,000 CY. Placement: river placement. If awarded, an additional 23 calendar days will be added to the contract completion time. Option 2: dredging of four (4) sections within the GIWW Colorado River Channel between Sta. 13+884 and Sta. 83+229. Estimated quantity: 36,000 CY. Placement: river placement. If awarded, an additional 17 calendar days will be added to the contract completion time.

Details

Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents