Similar Projects
CWP 12 Design Package 1B Station Improvements (Land O Trees Lift Station)
Renovation
Bidding
$515,595 est. value
Shreveport, LA

CWP 12 Design Package 1A Station Improvements (Maywood Lift Station)
Renovation
Bidding
$404,980 est. value
Shreveport, LA

Tangi Lakes LS & FM Improvements
New Construction
Post-Bid
$580,000 est. value
Hammond, LA

Pete's Highway Lift Station
New Construction
Post-Bid
Denham Springs, LA

SB 1811 Farr Park Equestrian Center Phase 1 Arena
New Construction
Results
$740,000 to $800,000 est. value
Baton Rouge, LA 70820

Sunshine Wastewater Treatment Plant - Effluent Pump Station Rehabilation
Renovation
Results
$359,000 est. value
Sunshine, LA

Lift Stations Backflow Preventative Maintenance Service
Renovation, Infrastructure
Bidding
Reserve, LA

Farmsite Pump Station Force Main from Pump Station R2-01 to Riverbend Pond
New Construction
Post-Bid
Chalmette, LA

Construction Of West Monroe Pump Station Repairs
New Construction
Results
Monroe, LA

Water System Improvements
New Construction, Infrastructure
Bidding
$300,000 est. value
Mansura, LA

High Lift Pump Room and the Panola Pump Station Improvements
New Construction
Post-Bid
New Orleans, LA

River Pump Station Hazard Mitigation
Renovation
Results
Baton Rouge, LA

Constructing a Stormwater Pump Station
New Construction
Post-Bid
Saint Martinville, LA

Lift Station and Blower Controls Electric Panels
New Construction, Alteration
Results
LA

Upgrade Martin Luther King Dr Lift Station And Various Manhole Repairs
Renovation
Post-Bid
Deridder, LA 70634

Last Updated 06/28/2022 04:40 AM
Project Title

Paper Mill Pump Station Repairs

Physical Address View project details and contacts
City, State (County) Monroe, LA   (Ouachita County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $825,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents