Similar Projects
Maple Avenue South Sidewalk
Infrastructure
Bidding
$600,000 est. value
Westport, CT 06880

ADA Ramp and Main Entrance Repairs - City Hall
Renovation, Infrastructure
Bidding
$200,000 est. value
Bridgeport, CT 06604

Sidewalk Repair and Rehabilitation Program
Post-Bid
Darien, CT

Webster Street Lot Redevelopment
Infrastructure
Post-Bid
Norwalk, CT

Balmforth Avenue Sidewalks, Intersection and Related Improvements
Results
Danbury, CT

Removal and Replacement of Siding, Windows, Entry Doors and Repaving of Parking Lot at Ludlow Village Apartments
Results
Norwalk, CT 06855

Avery Place Utility Burial Project
Infrastructure
Post-Bid
$850,040 est. value
Westport, CT

Norwalk River Valley Trail - Wil-Walk Construction
Results
Wilton, CT

Wilton Station Pedestrian Walkway Bridge
New Construction, Infrastructure
Post-Bid
Wilton, CT

Downtown Intermodal Urban Design Enhancement
Results
Bridgeport, CT 06604

Combined Use Pathway - Ligi Way and Farmingville Road
Infrastructure
Post-Bid
$200,000 est. value
Ridgefield, CT

Downtown Danbury Transit-Oriented Development ("TOD") Streetscape Renaissance Project - Phase 1
Results
$1,250,000 est. value
Danbury, CT

Pavement Preservation and Repairs, Spring 2022
Infrastructure
Post-Bid
$500,000 est. value
Westport, CT

Governor Street Parking Lot Expansion
Results
Ridgefield, CT 06877

Eden Drive Parking Lot Repaving
Infrastructure
Post-Bid
$300,000 est. value
Danbury, CT 06811

Last Updated 06/15/2022 09:01 AM
Project Title

New Parking Lot at Schenck's Island - City of Wilton

Physical Address View project details and contacts
City, State (County) Wilton, CT 06897   (Fairfield County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope of work has not been determined. As of June 10, 2022, this project is in the conceptual phase. An architect has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to June 2023.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents