Similar Projects
Clay Street Sidewalk and Roadway Improvements - Town of Blacksburg
Infrastructure
Conception
$2,791,500 CJ est. value
Blacksburg, VA 24060

Innovation Park Pedestrian Improvements - Prince William County
Infrastructure
Conception
$2,295,000 CJ est. value
Gainesville, VA 20155

Neabsco Mills Road (Route 1 to Dale Boulevard) - Prince William County
Infrastructure
Design
$29,577,000 CJ est. value
Woodbridge, VA 22191

Jefferson Avenue Improvements - 105867 - City of Richmond
Infrastructure
Design
$1,500,000 CJ est. value
Richmond, VA 23223

Newbridge Firehouse 23
LEED Certification, New Construction, Infrastructure - 25,915 SF
Bidding
$12,200,000 CJ est. value
Richmond, VA 23223

2023 Plant Mix / Concrete Repair - Primary
Infrastructure
Bidding
$1,867,000 CJ est. value
Cape Charles, VA 23310

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Sweeping and Power Washing for Science Museum Parking Deck
Term Contract
Results
Richmond, VA 23220

Districtwide Bridge Cleaning
Infrastructure
Results
$500,000 est. value
VA

Devlin Road Widening - Prince William County
Infrastructure
Pending Verification
$52,082,000 CJ est. value
Woodbridge, VA 22191

RFP Engineering - Route 28 Bypass - Prince William County
Infrastructure
Pending Verification
$298,400,000 CJ est. value
Bristow, VA 20136

RFP - Construction of Sidewalk and Multi-Use Trail
Infrastructure
Conception
$900,000 CJ est. value
Stuart, VA 24171

Minnieville Road/Prince William Parkway Interchange - Prince William County
Infrastructure
Design
$70,000,000 CJ est. value
Manassas, VA 20111

Smart Scale - Road Reconstruction
Infrastructure
Bidding
Exmore, VA 23350

Last Updated 05/23/2023 01:05 PM
Project Title

Route 29 Road Widening - Virginia Department of Transportation

Physical Address View project details and contacts
City, State (County) Fairfax, VA 22030   (Fairfax City County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $81,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call to econstruct and widen 1.5 miles of Route 29 (Lee Highway) from four to six lanes between Union Mill Road and Buckleys Gate Drive. It will relieve a major bottleneck during AM and PM peak hours, with lengthy backups occurring in particular at the signal for Stringfellow/Clifton roads (Route 645). The project will also correct vertical alignment to improve sight distance, add/improve bicycle and pedestrian facilities on both sides of Route 29 and provide connectivity to pedestrian/bicycle trails at the Fairfax County Parkway/West Ox Road interchange. Multiple public outreach efforts are planned. As of May 23, 2023 project is under construction and expeced to be completed Spring 2026.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents