Similar Projects
Countywide Mast Arms - Group 1
Infrastructure
Design
$2,000,000 CJ est. value
Clearwater, FL 33755

RFP D/B - US 41 Over Caloosahatchee River Bridge #120002
Infrastructure
Bidding
$26,046,845 CJ est. value
Villas, FL 33907

Turner Cemetery Road Paving
Infrastructure
Bidding
$300,000 CJ est. value
Sanderson, FL 32087

ITS Communication System
Infrastructure
Sub-Bidding
$704,550 CJ est. value
Cocoa, FL 32926

RFQ Contractor - Prequalification for Asphalt and Concrete Maintenance and Other Related Work
Term Contract
Sub-Bidding
Miami, FL 33132

Annual Ready Mix Concrete
Term Contract
Post-Bid
Gainesville, FL 32601

Asphalt Concrete (Hot Mix)
Term Contract
Post-Bid
Brooksville, FL 34601

Region 4,GSA PBS, Design-Build Concrete and Crack Water Fountain Repairs, Fort Lauderdale, FL
Results
$500,000 to $1,000,000 est. value
Fort Lauderdale, FL 33301

Miscellaneous Concrete Continuing Services Contract
Term Contract
Results
Destin, FL

Resurfacing
Infrastructure
Bidding
$11,293,976 CJ est. value
Sebring, FL 33870

DB MATOC - Corrosion Facility/Wash Rack
New Construction, Infrastructure - 19,500 SF
Post-Bid
$25,000,000 CJ est. value
Homestead, FL 33039

Pre-Cast Restrooms at County Parks
Alteration
Results
Tavares, FL

Resurfacing/ Drainage Improvements/ Base Work /Sidewalk
Infrastructure
Bidding
$2,712,981 CJ est. value
Miramar, FL 33023

Concrete Repair, Installation, and Emergency Repairs
Alteration
Post-Bid
Fort Pierce, FL

Concrete Placement and Finishing Services
Term Contract, Alteration
Results
Orange Park, FL

Last Updated 03/15/2023 04:03 PM
Project Title

London Waterway Expansion

Physical Address View project details and contacts
City, State (County) Palm Coast, FL 32164   (Flagler County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $7,500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Palm Coast is seeking qualified Contractors to expand the Stormwater attenuation and treatment capacity of the London Waterway by construction of a lake on City-owned property that is adjacent to the London Canal, in accordance with the attached set of construction plans. The stormwater storage capacity "lake" to be created is located in the Matanzas Woods Neighborhood on the northern part of Palm Coast City Limits (see location maps) and is surrounded by residential homes. Access to this site will be through easements and indicated on construction plans. The Contractor shall provide all work required for a completed project including, but not limited to labor, supervision, traffic control, materials, equipment, installation, and incidentals required for a complete project. CONTRACTOR shall also provide material samples, as necessary, to ensure compliance with manufacturer's recommendations. Installation of all materials shall be in accordance with all applicable CITY standards and requirements, applicable Florida Department of Transportation (FDOT) Standard Specifications for Road and Bridge Construction (latest edition), manufacturer and industry preferred standards. BID SECURITY/BID BOND: A Bid Bond shall accompany each Bid if the Bid amount is one-hundred thousand dollars ($100,000) or greater. The Bid Bond shall be for an amount not less than five percent (5%) of the Bid price and shall be made payable to the City as a guarantee that the Bidder will not withdraw his/her Bid for a period of one hundred twenty (120) days after the Bid closing time. PERFORMANCE, PAYMENT, & MATERIAL AND WORKMANSHIP BONDS: In the event the Contract is awarded to the Successful Bidder and will enter into a written Agreement with the City and furnish a Payment Bond and Performance Bond in an amount equal to the Contract Price. The Material and Workmanship Bond shall be in an amount equal to ten percent (10%) of the Contract Price as adjusted on the Final Application for Payment. The Bidder will forfeit their Bid Security if they fail to do so. All Bonds shall be secured from or countersigned by an agency or surety company recognized in good standing and authorized to do business in the State of Florida. Any questions concerning the intent, meaning and interpretations of the bid documents including the draft agreement, shall be requested in writing through electronically. Intent to Bid by Mar 14, 2023 2:00 PM EDT.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents