Similar Projects
Eve Circle Roadway & Drainage Improvements
Bidding
De Funiak Springs, FL 32433

Parking Lot Expansion Freeport Business Park
Bidding
FL

Washington County Concrete Drainage Features
Post-Bid
Chipley, FL 32428

Don Bishop Road Cross Drain Replacement
Post-Bid
FL

Drainage Repairs
Results
Less than $225,000 est. value

Drainage Repairs
Results
Less than $225,000 est. value

Retention Pond Maintenance
Bidding
$25,000 est. value
FL

Walton County Middle School Retaining Wall
Post-Bid
DeFuniak Springs, FL 32435

Drainage
Results
Less than $1,387,468 est. value
FL

Drainage
Results
Less than $335,077 est. value
FL

Western Lake Phase I Drainage Improvements
Results
De Funiak Springs, FL 32433

Mack Bayou Road Drainage Improvements
Results
De Funiak Springs, FL 32433

Drainage
Results
Less than $300,000 est. value

Grassing, Seeding, Sodding
Results
Less than $237,140 est. value
FL

Drainage
Results
Less than $200,000 est. value

Last Updated 03/13/2020 08:23 AM
Project Title

Grassing, Seeding, Sodding

Physical Address View project details and contacts
City, State (County) (Holmes, Walton, Washington Counties)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work specified in this Work Document-Driven Contract consists of reshaping ditches and reworking shoulders along State Road 8 (Interstate 10) on a call out basis in Holmes, Walton and a portion of Washington Counties. These ditches are non-typical and should be re-graded to +/- 3 inches of the original flow line to create a free and unobstructed flow of drainage water. Section 0001 Sodding (Sy) 0104- 10- 3 Sediment Barrier Lf 1,000.000 e120- 10- 2 Clean And Reshape Ditch (Haul) Lf 2,000.000 e570- 5- Fertilizer Tn 25.000 e570- 9- 1 Water For Grass & Plants Mg 100.000 e575- 1- Sodding Sy 115,000.000 e577- 70- Shoulder Rework Sy 115,000.000

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Turf and Grasses, Seeding, Sodding.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents