Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Pilibos Park Irrigation Pump Control and Turf Replacement
Renovation, Infrastructure
Bidding
$400,000 CJ est. value
Fresno, CA 93727

AutoZone #6031 / Fresno
New Construction, Infrastructure - 6,454 SF
Bidding
$1,500,000 CJ est. value
Fresno, CA 93703

Fencing Maintenance, Repair and Replacement Services in Orange County
Term Contract
Sub-Bidding
$306,696 CJ est. value
Fresno, CA 93721

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

CA NPS PP SEKI 2018(3) CA NPS PP SEKI 2020(1) Pavement Preservation Lassen Seki Phase I and Pavement Preservation Seki Phase II
Term Contract
Post-Bid
Fresno, Sequoia National Park, CA

Fancher Creek Trail
Infrastructure
Results
$669,877 est. value
CA

Lincoln Avenue Cold Pavement Recycling
Infrastructure
Results
$11,875,000 to $12,125,000 est. value
Clovis, CA 93630

GAOA Jerseydale CG Rehabilitation Phase 4, Sierra National Forest
Infrastructure, Renovation
Bidding
$500,000 CJ est. value
Clovis, CA 93612

Cultural and Environmental MATOC
Term Contract
Post-Bid

Tamarack Sno-Park Repaving
Term Contract
Results
$250,000 to $500,000 est. value
Shaver Lake, CA 93664

Jaswant Singh Khalra (JSK) Park Tot Lot Replacement Project
Infrastructure
Bidding
$278,000 CJ est. value
Fresno, CA 93722

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Asbestos Abatement, Lead-Based Paint, Lead-Containing Paint, Lead-Containing Construction Materials and Mold Removal Inmate and Ward Labor Program
Alteration
Results
$3,000,000 est. value
Avenal, Blythe, Calipatria, Chino, Chowchilla, Coalinga, Corcoran, Corona, Crescent City, Delano, Folsom, Imperial, Ione, Jamestown, Lancaster, Norco, Sacramento, San Diego, San Quentin, Soledad, Stockton, Susanville, Tehachapi, Vacaville, Wasco, CA 93204

Well No. 35 Drilling and Development
Infrastructure
Bidding
$655,500 CJ est. value
Clovis, CA 93611

Last Updated 07/29/2022 01:31 AM
Project Title

Lakeshore Stewardship IRSC

Physical Address View project details and contacts
City, State (County) Prather, CA 93651   (Fresno County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Environmental, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bid Cancelled. The Government is cancelling solicitation 12363N22Q4051 in order to revise portions of the solicitation package to promote better competition for this project. The new Request For Quote (RFP) will be solicitation 12363N22Q4087 and shall be issued on sam.gov with a shortened response deadline. Please note the project will not be pre-solicited again as this notice requirement has already been met. Description The Lakeshore Stewardship IRSC shall be awarded under the following authority. Stewardship Authority: Section 604 (16 USC 6591c) of Public Law 108-148 as amended by Section 8205 of Public Law 113-79, the Agricultural Act of 2014--Grants the U.S. Forest Service (Government) permanent authority to enter into stewardship contracts or agreements to achieve land management goals for the National Forests or public lands that meet local and rural community needs. Section 8205 supersedes the temporary authority granted to the Forest Service (Government) in section 347 of Public Law 105-277, the Omnibus Consolidated and Emergency Appropriations Act, 1999. Location The Contract Area is located on the High Sierra Ranger District of the Sierra National Forest, north of Lake Huntington. Legal land description is T8S, R25E, Sections 1, 2, 11, 12, and 14; Mt. Diablo Meridian in Fresno County, California. See attached Vicinity Map. The Sierra National Forest is currently preparing the Lakeshore Stewardship IRSC to reduce fuel accumulation within the wildland urban interface (WUI), restore areas of high intensity fire damaged ecosystems and to recover the value of the fire killed and damaged trees within a portion of the Creek Fire within the Huntington Lake Basin while addressing the area for the safety of the residents, recreationalist and forest staff. This will be done by accomplishing the following: Cut fire killed trees adjacent to forest roads and trails to provide for public safety. Remove salvageable included saw timber from the Contract Area to reduce hazardous fuel loading. Mechanically remove cull trees to landings to be disposed of by FS. Remove slash from units 76, 79, and 80 to a designated disposal site to be burned by FS. Pile slash within the interior of units 77, 82, and 121 and construct fire-line around unit perimeters. Reconstruct and maintain roads for safe access to the Contract Area. The resultant contract will include Forest product removal of 417 acres; felling, skidding and decking 417 acres; removing slash to disposal site of 155 acres; and interior piling and building fireline for 263 acres. The following work activities are anticipated as mandatory service items: Cut and Remove Included Timber Fell, Skid, and Deck Remove Slash to Disposal Site Interior Piling and Building Fireline Road Maintenance Road Reconstruction The following work activity is anticipated as an optional service item: Splitting Root-Wads A site visit is scheduled for June 16, 2022 to view the project area and discuss the objectives of this contract. Meet at 9:00 a.m. at the High Sierra Ranger District, 29688 Auberry Rd, Prather, CA 93651. The solicitation will be posted on or about May 26, 2022 and should be downloaded from this website at that time. Proposals will be due on or around June 28, 2022. The period of performance is estimated to be from date of award through December 20, 2024. Point of contact is, Jeanne Windle, Contracting Officer, with the National Stewardship Contracting Branch at norma.windle@usda.gov. Questions must be submitted in writing and emailed to norma.windle@usda.gov. The method of contractor selection has not been determined at this time.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Hazardous Material Assessment, Site Remediation, Water Remediation, Asbestos Remediation.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Wetlands.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents