Similar Projects
Panera Bread - Commerce Plaza Boulevard / St. Augustine
New Construction, Infrastructure - 3,600 SF
Conception
$1,100,000 CJ est. value
Saint Augustine Beach, FL 32084

Robert F. Ensslin Armory Expansion State Road 207 - Florida Army National Guard Headquarters
Addition, Demolition, Renovation, Infrastructure - 60,535 SF
Conception
$16,949,800 CJ est. value
Saint Augustine Beach, FL 32084

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Tolomato River Farms
New Construction, Infrastructure - 5,000 SF
Design
$20,200,000 CJ est. value
Saint Augustine Beach, FL 32084

Heartland Dental / Saint Johns
New Construction, Infrastructure - 4,280 SF
Bidding
$2,400,000 CJ est. value
Saint Johns, FL 32259

Hot Pot Restaurant / Saint Johns
New Construction, Infrastructure - 6,263 SF
Bidding
$1,900,000 CJ est. value
Saint Johns, FL 32259

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Surfwood Subdivision Roadway and Drainage Improvements
Infrastructure
Post-Bid
$1,739,850 CJ est. value
Saint Augustine Beach, FL 32084

Roadway and Infrastructure Improvements - North Holmes Boulevard and King Street Extension Intersection
Infrastructure
Results
$3,846,100 CJ est. value
Saint Augustine Beach, FL 32084

CDBG-DR Project Big Sooey Drainage Improvements
Infrastructure
Results
$3,341,864 CJ est. value
Hastings, FL 32145

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Beaver Toyota - Rebid
New Construction, Infrastructure - 104,883 SF
Construction
$27,000,000 CJ est. value
Saint Augustine Beach, FL 32084

Grand Cypress Marketplace
Demolition, New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Saint Johns, FL 32259

SR-23 from I-95 to East of CR-16A Spur / I-95 - S of International Golf Parkway to S of SR 23 Interchange
Infrastructure
Pending Verification
$386,000,000 CJ est. value
Saint Augustine Beach, FL 32084

County Road 13 North Storage Facility
New Construction, Infrastructure - 56,000 SF
Conception
$6,000,000 CJ est. value
Saint Augustine, FL 32092

Last Updated 07/11/2023 05:02 PM
Project Title

UF Marine Research Institute Building at the University of Florida Whitney Labs Campus

Physical Address View project details and contacts
City, State (County) Anastasia Is, FL 32080   (Saint Johns County)
Category(s) Heavy and Highway, Laboratory
Sub-Category(s) Laboratory, Site Development
Contracting Method Competitive Bids
Project Status Request for Qualifications, Design Development, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $30,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 11, 2023, this project's timeline has been pushed forward to early 2024. Preliminary budgetary bidding is expected in the next 30-45 days and some bid packages will be awarded after that event. Prequalified bidders will be added the Construction Manager's database and will receive notification thru that system. It is still possible to prequalify for this project and for future projects by visiting: https://www.dpr.com/subcontractor-prequalification. As of February 16, 2023, this project has been redesigned and is now expected to start construction no sooner than third quarter 2023. Opportunities remain for prequalifying for this and other work for the Construction Manager. Please visit https://www.dpr.com/subcontractor-prequalification.

Details

37,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents