Similar Projects
New Middle School
New Construction
Conception
Maynardville, TN

Richland High School Replacement Facility - 18AC0003 - City of Nashville
New Construction
Conception
$9,623,000 est. value
Nashville, TN

Virtual School Offices Build Out
New Construction, Renovation, Addition, Build-Out
Design
$4,000,000 est. value
TN

Mid-South Gifted Academy
New Construction - 10,580 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Collierville, TN 38017

Upperman High School Baseball Field Improvements
Infrastructure
Bidding
$14,000,000 CJ est. value
Baxter, TN 38544

Renovations to CTE Facility at Heritage High School
Renovation
Bidding
$150,000 CJ est. value
Maryville, TN 37804

EO Coffman Middle School
Renovation, Addition
Post-Bid
Lawrenceburg, TN 38464

Hillwood High School
New Construction - 300,000 SF
Post-Bid
Nashville, TN 37221

Middle School - University of Memphis
Results
Memphis, TN 38111

Kingsbury High School Gymnasium
New Construction
Results
Memphis, TN 38122

Chambliss Classrooms
Renovation - 11,408 SF
Construction
Chattanooga, TN 37411

Kirkwood Middle School
New Construction
Construction
$35,000,000 est. value
Clarksville, TN 37043

Student Life Building - Brentwood Academy
New Construction
Pending Verification
Brentwood, TN

Spring Hill High School Conversion to Elementary School
Build-out, Renovation, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Columbia, TN 38401

New High School - Maury County School District
New Construction, Infrastructure
Conception
$70,000,000 CJ est. value
Columbia, TN 38401

Last Updated 09/14/2022 02:33 AM
Project Title

Bearden Middle School Space Upgrade - Knox County

Physical Address View project details and contacts
City, State (County) Knoxville, TN 37909   (Knox County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $5,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not been identified. As September 14, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents