Similar Projects
Bruce Freeman Rail Trail
Bidding
Acton, MA

Sidewalk Construction
Bidding
Acton, MA

Walkway Replacement
Post-Bid
$20,000 est. value
North Billerica, MA 01862

Construction Management at Risk Services - Logan Express Parking Facility Expansion
Post-Bid
Less than $30,000,000 est. value
Framingham, MA

Patton Road Sidewalk Improvements Project
Results
$275,000 est. value
Devens, MA

Cement Concrete Sidewalks and Granite Curbing
Term Contract
Results
Belmont, MA

Sidewalk Construction Harris Street
Bidding
Acton, MA 01720

Thoreau House Site Trail Improvements
Post-Bid
$425,000 est. value
Concord, MA

Sidewalk and ADA Improvements at Various Locations
Results
Less than $416,336 est. value

2021 Parking Lots Rahanis Park
Bidding
Burlington, MA

Sidewalk Repairs
Post-Bid
$75,000 est. value
Somerville, MA

Sidewalk and ADA Improvements and Related Work (Including Signals) Along Sections of Routes 107, 127 And 129
Results
Less than $1,230,000 est. value

Sidewalk Repairs for the City
Bidding
Somerville, MA

Weston Manor Parking Lot Improvement Project
Post-Bid
Less than $46,000 est. value
Somerville, MA 02143

Lexington Community Center Walkway Improvements
Results
Less than $285,000 est. value
Lexington, MA 02420

Last Updated 03/18/2020 11:09 AM
Project Title

Construction of the Bruce Freeman Rail Trail (BFRT) - Phase 2B

Physical Address View project details and contacts
City, State (County) Acton, Concord, MA   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $9,527,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"1.000","Ls","Schedule Of Operations - Fixed Price $72000","100." "3.400","a","Clearing And Grubbing","101." "0.500","a","Selective Clearing And Thinning","102." "40.000","Hr","Tree Trimming Crew","102.001" "100.000","Hr","Control Of Invasive Plants Existing On Site","102.3" "10.000","Hr","Invasive Plant Management Strategy","102.33" "25.000","Ea","Tree Protection - Armoring & Pruning","102.511" "8.000","Ft","Tree And Plant Protection Fence","102.521" "1.000","Ls","Removal Of Superstructure Of Bridge No. c-19-037","114.5" "1.000","Ls","Handling And Transportation Of Superstructure Of Bridge No. c-19-037","114.51" "3600.000","Cy","Earth Excavation","120." "20.000","Cy","Class a Rock Excavation","121." "200.000","Cy","Muck Excavation","123." "4200.000","Ft","Track Excavation","129.5" "8400.000","Ft","Handling And Transportation Of Rail Components","129.7" "150.000","Ton","Handling And Transportation Of Other Track Materials","129.71" "2870.000","Cy","Bridge Excavation","140." "50.000","Cy","Class a Trench Excavation","141." "25.000","Cy","Test Pit For Exploration","141.1" "20.000","Cy","Class b Trench Excavation","142." "10.000","Cy","Class b Rock Excavation","144." "11050.000","Cy","Ordinary Borrow","150." "200.000","Cy","Special Borrow","150.1" "3400.000","Cy","Gravel Borrow","151." "1635.000","Cy","Gravel Borrow For Bridge Foundation","151.1" "775.000","Cy","Gravel Borrow For Backfilling Structures And Pipes","151.2" "1050.000","Ton","Crushed Stone","156." "145.000","Ton","Crushed Stone For Bridge Foundations","156.1" "11100.000","Sy","Fine Grading And Compacting - Subgrade Area","170." "1.000","Ls","Environmental Health And Safety Program","180.01" "10.000","Hr","Personal Protection Level c Upgrade","180.02" "240.000","Hr","Licensed Site Professional Services","180.03" "10.000","Ton","Disposal Of Unregulated Soil","181.11" "10.000","Ton","Disposal Of Regulated Soil - In-State Facility","181.12" "10.000","Ton","Disposal Of Regulated Soil - Out-Of-State Facility","181.13" "10.000","Ton","Disposal Of Hazardous Waste","181.14" "1000.000","Gal","Treatment Of Contaminated Groundwater","183.1" "500.000","Lb","Disposal Of Granular Activated Carbon","183.2" "285.000","Ton","Disposal Of Treated Wood Products","184.1" "1.000","Ea","Catch Basin","201." "1.000","Ea","Manhole","202." "8.000","Ea","Drainage Structure Adjusted","220." "1.000","Ea","Drainage Structure Remodeled","220.5" "1.000","Ea","Frame And Cover","221." "1.000","Ea","Frame And Grate - Massdot Bar Type","222." "25.000","Cy","Removal Of Drainage Structure Sediment","227.3" "450.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "1.000","Ls","Precast Concrete Culvert - 48 x 48 Inches","236.01" "45.000","Ft","10 Inch Ductile Iron Pipe","238.10" "245.000","Ft","12 Inch Reinforced Concrete Pipe","241.12" "40.000","Ft","Infiltration Trench ","290.3" "1.000","Ls","Bioretention Basin (Sta 23+00 Rt)","295.01" "1.000","Ls","Bioretention Basin (Sta 32+00 Rt)","295.02" "2.000","Ea","Monitoring Well Decommissioned And Abandoned","385.1" "125.000","Cy","Dense Graded Crushed Stone For Sub-Base","402." "200.000","Cy","Pavement Milling Mulch For Shoulders","402.14" "25100.000","Sy","Pavement Micro Milling","415.3" "34000.000","Lb","Calcium Chloride For Roadway Dust Control","440." "35.000","Mgl","Water For Roadway Dust Control","443." "1000.000","Ton","Superpave Surface Course - 12.5 (Ssc - 12.5)","450.23" "2750.000","Ton","Superpave Surface Course - 12.5 Polymer (Ssc - 12.5 - p)","450.231" "1450.000","Ton","Superpave Intermediate Course - 19.0 (Sic - 19.0)","450.32" "10.000","Ton","Superpave Bridge Surface Course - 9.5 (Ssc-b - 9.5)","450.60" "10.000","Ton","Superpave Bridge Protective Course - 9.5 (Spc-b - 9.5)","450.70" "150.000","Ton","Hma For Patching","451." "2260.000","Gal","Asphalt Emulsion For Tack Coat","452." "3750.000","Ft","Hma Joint Sealant","453." "350.000","Ft","Hot Mix Asphalt Berm, Type a - Modified","470.2" "58.000","Ton","Asphalt Mixtures For Temporary Work","472." "5450.000","Ft","Milled Rumble Strip","477." "170.000","Ft","Sawing & Sealing Joints In Asphalt Pavement At Bridges","482.31" "1975.000","Ft","Guardrail, Tl-3 (Double Faced)","621.13" "2.000","Ea","Trailing Anchorage","627.1" "8.000","Ea","Transition To Nchrp 350 Guardrail","628.21" "8.000","Ea","Transition To Thrie Beam","628.25" "2100.000","Ft","Highway Guard Removed And Discarded","630.2" "2.000","Ea","Special Base Anchor For Guardrail Post","631." "1350.000","Ft","Privacy Screen","639." "1350.000","Ft","144 Inch Chain Link Fence (Pipe Top Rail) w/Barb (Line Post Option)","647.144" "20.000","Ft","144 Inch Chain Link Gate With Gate Posts And Barbed Wire","651.144" "1250.000","Ft","Timber Rail Fence","655.01" "968.000","Ft","Timber Rail Fence On Bridge & Walls","655.02" "550.000","Ft","Timber Rail Fence-52 Inch Height","655.04" "360.000","Ft","Sedimentation Fence","697." "10.000","Ea","Silt Sack","697.1" "1400.000","Sy","Geotextile Fabric For Separation","698.3" "6.000","Ea","Park Bench","707.1" "3.000","Ea","Granite Mile Marker","710.8" "1.000","Ls","Semaphore Repair","714.6" "1.000","Ea","Battery Well Removed And Reset","714.8" "3.000","Ea","Sign - Interpretive - Nps Standard","734.2" "29.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "1100.000","Cy","Loam Borrow","751." "1160.000","Hr","Environmental Monitor","755.5" "1.000","Ls","Wildlife Culvert Monitoring","755.6" "1.000","Ls","Npdes Stormwater Pollution Prevention Plan","756." "7700.000","Sy","Seeding","765." "800.000","Sy","Seeding - Mid-Height Upland Mix - Part Shade","765.421" "2650.000","Ft","Sediment Control Barrier","767.121" "1300.000","Sy","Composted Mulch Over Modified Rock","767.78" "2350.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "15.000","Ea","Pine - White 5-6 Feet","773.436" "7.000","Ea","Spruce - White 7-8 Feet","774.642" "13.000","Ea","Hornbeam - American 8-10 Feet","775.038" "7.000","Ea","Oak - Northern Red 2-2.5 Inch Caliper","777.036" "2.000","Ea","Oak - Pin 2-2.5 Inch Caliper","777.138" "7.000","Ea","Sweetgum 2-2.5 Inch Caliper","777.673" "3.000","Ea","Birch - River 'Heritage' 8-10 Foot Clump","778.161" "17.000","Ea","Shad Tree - Allegheny Clump 4-5 Feet","783.037" "25.000","Ea","Bayberry Shrub - Northern 2-3 Feet","789.333" "25.000","Ea","Blueberry - Lowbush 6-9 Inch Height","789.669" "22.000","Ea","Summersweet Shrub 18-24 Inch","794.731" "8.000","Ea","Viburnum - Highbush Cranberry 3-4 Feet","795.053" "28.000","Ea","Viburnum - Leatherleaf 24-30 Inch","795.057" "9.000","Ea","Viburnum - Nannyberry 24-30 Inch","795.069" "3.000","Ea","Winterberry - Male 18-24 Inch","795.151" "25.000","Ea","Winterberry - Female 24-30 Inch","795.157" "17.000","Ea","Virginia Creeper 1 Gallon","796.071" "700.000","Ea","Little Bluestem - Plugs","796.481" "150.000","Ft","4 Inch Electrical Conduit - Type Nm (3 Bank)","801.43" "1.000","Ea","Electric Handhole - (Municipal Standard)(Excluding Cost Of Emh & Casting)","811.271" "1.000","Ls","Telegraph Pole And Overhead Wire Removed And Discarded","826.8" "30.000","Sf","Warning-Regulatory And Route Marker - Alum. Panel (Type a)","832." "2.000","Ea","Delineation For Guard Rail Termini","833.7" "6.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/1 Brkway Post Assembly - Steel","847.1" "450.000","Hr","Roadway Flagger","850.41" "40.000","Day","Traffic Cones For Traffic Management","851.1" "750.000","Sf","Safety Signing For Traffic Management","852." "16.000","Ea","Portable Breakaway Barricade Type Iii","853.1" "4700.000","Ft","Temporary Barrier Removed And Reset","853.21" "1700.000","Ft","Temporary Barrier (Tl-3)","853.23" "4500.000","Ft","Temporary Barrier - Limited Deflection (Tl-3)","853.33" "120.000","Day","Truck Mounted Attenuator","853.403" "4.000","Ea","Temporary Impact Attenuator Removed And Reset","853.501" "2.000","Ea","Temporary Impact Attenuator Unidirectional, Non-Redirective (Tl-3)","853.53" "20.000","Day","Temporary Illumination For Work Zone","853.8" "700.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "34500.000","Ft","Temporary Paving Markings - 6 Inch (Tape)","854.036" "15700.000","Sf","Pavement Marking Removal","854.1" "40.000","Day","Arrow Board","856." "1300.000","Day","Portable Changeable Message Sign","856.12" "9400.000","Day","Reflectorized Drum","859." "1820.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "100.000","Sf","Pavement Arrow & Legend Refl. White (Polyurea) (Recessed)","864.10" "8500.000","Ft","6 Inch Wet Reflective Recessed White Line (Thermoplastic)","868.106" "100.000","Ft","12 Inch Wet Reflective Recessed White Line (Thermoplastic)","868.112" "120.000","Ft","4 Inch Wet Reflective Recessed White Line (Preformed)","868.304" "7250.000","Ft","6 Inch Wet Reflective Recessed Yellow Line (Thermoplastic)","869.106" "2.000","Ea","Traffic Sign Removed And Stacked","874.4" "6.000","Cy","4000 Psi, 1.5 Inch, 565 Cement Concrete For Post Foundation","901.3" "380.000","Ft","Drilled Micropiles","945.10" "1.000","Ea","Micropile Verification Load Test","948.60" "2.000","Ea","Micropile Proof Load Test","948.61" "1200.000","Ton","Modified Rockfill","986." "1.000","Ls","Control Of Water - Structure No. c-19-040","991.1" "1.000","Ls","Control Of Water - Structure No. Precast Concrete Culvert 48 x 48 Inches","991.2" "1.000","Ls","Bridge Structure, Bridge No. c-19-039 (Buj)","995.01" "1.000","Ls","Culvert Structure, Culvert No. c-19-040 (Buk)","995.011" "1.000","Ls","Bridge Structure, Bridge No. c-19-037 (Bf4)","995.02" "1355.000","Sy","Mechanically Stabilized Earth Wall","996.31" "260.000","Cy","Expanded Polystyrene","997."

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents