Similar Projects
G V Kirk Middle School Water Fountain Replacements
Bidding
Newark, DE 19713

Cheswold Water Main Extension/Fire Protection
Post-Bid
Cheswold, DE 19936

Pilottown Road Sewer and Water Improvements
Post-Bid
Lewes, DE 19958

Shallcross Avenue Sewer Separation
Results
Wilmington, DE 19801

Columbia Avenue Water Main Replacement
Results
Dover, DE 19901

Western Sussex Transmission Facilities: Route 13 Force Main Project
Construction
DE

Cured in Place Pipe Lining Service
Post-Bid
New Castle, DE 19720

FY20 Inflow and Infiltration Project
Results
Dover, DE 19904

H--Replacement SPS RO Water Filtration Sources Sought
Post-Bid
Wilmington, DE 19805

North Shores Water Meter Replacement Project
Results
Rehoboth Beach, DE 19971

Dover Air Park Water Distribution System Ugrades
Renovation
Post-Bid
Dover, DE 19901

Delaware Avenue Water Main Replacement
Results
Laurel, DE 19956

High Pressure Hose Replacement
Post-Bid
Dover, DE 19902

Robinsonville Road Core Infrastructure
Results
$1,635,126 est. value
Georgetown, DE 19947

Marshalton Heights Water Main Renewal
Renovation
Post-Bid
Marshallton, DE

Last Updated 12/31/2019 04:37 PM
Project Title

Western Sussex Transmission Facilities: Herring Run and Heritage Shore Force Mains

Physical Address View project details and contacts
City, State (County) Georgetown, DE 19947   (Sussex County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Herring Run 3,480 lineal feet of open cut 8" C900 PVC force main; 1,036 lineal feet of open cut 12" C900 PVC force main; 17 lineal feet of open cut 16" C900 force main; 60 lineal feet of open cut 10" C900 PVC pipe in 16" steel casing pipe force main; 70 lineal feet of jack and bored 10" C900 PVC pipe in 16" steel casing pipe force main; 285 lineal feet of directionally drilled 10" HDPE DR-11 force main; three (3) 8" gate valves; one (1) 10" gate valve; 54 lineal feet of open cut 15" SDR-35 gravity sewer main; one (1) force main discharge manhole complete; 5 air release valve manholes including covers and frames; replacement, removal, and reinstallation of approximately 20 lineal feet of concrete curb; temporary paving repairs of approximately 1,762 square yards of GABC and Type C paving section; permanent paving repairs of 2,360 square yards of BCBC paving section; approx. 6,240 square yards of Type C paving restoration including mill and overlay; 45 square yards of PCC permanent paving patch. There is also an add alternate of 3,560 lineal feet of open cut 10" C900 PVC force main; two (2) air release valve manholes including covers and frames; three (3) 2" service saddle tap and corporation stop; four (4) 12` fence gates. The work consists of the furnishing of all labor, materials, transportation, tools, supplies and equipment necessary for a pipeline installation and surface restoration.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents