Similar Projects
2021 Curb Replacement
Conception
$400,000 est. value
Cedar Rapids, IA

6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

Walnut Street Streetscape Phase 1
Infrastructure, Alteration
Bidding
Dallas Center, IA 50063

700 Blocks South 3rd Street and South 4th Street Reconstruction
Infrastructure
Bidding
$553,860 est. value
Clinton, IA 52732

Easton Valley High School Parking Lot
Infrastructure
Post-Bid
Preston, IA 52069

10th Avenue Sidepaths
Infrastructure
Post-Bid
IA

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Results
$510,000 est. value
Prairie City, IA 50228

High Trestle Trail Trailhead Parking Lot
Results
Ankeny, IA 50023

Bettendorf Road Repairs For 18Th Street
New Construction, Alteration
Pending Verification
Bettendorf, IA 52722

Cherokee Trail Phase 2B from Cherry Hill Park through Cherokee Park
Conception
$3,000,000 est. value
Cedar Rapids, IA 52405

High School Parking Lot Expansion
Infrastructure
Post-Bid
$1,028,199 est. value
Alleman, IA 50007

Gilbert Court Sidewalk Infill
Results
Iowa City, IA

Lindale Trail Phase I from Council Street to E/o C Avenue North East
Conception
$2,600,000 est. value
Cedar Rapids, IA 52407

Pottawattamie County Election's Building Parking Lot
Infrastructure
Post-Bid
Council Bluffs, IA

High School Parking Lot
Results
Waverly, IA

Reported 03/30/2022 12:10 PM
Project Title

Highway 38 - Cedar Street Improvements

Physical Address View project details and contacts
City, State (County) Tipton, IA 52772   (Cedar County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The extent of the work includes reconstruction of Highway 38 (Cedar Street) including intersections from South Street to 7th Street. Excavation will be placed on the west side of Highway 38 north of Alexander Drive to create an embankment for the proposed Sissel Behrle Trail. Utilities in the roadway including storm sewer, sanitary sewer and water main will be reconstructed. Sidewalks and driveways will be removed and replaced for ADA compliance. Light pole foundations will be installed on the north and south ends of Highway 38 within City limits. South Street to 3rd Street construction is scheduled for 2022 and 3rd Street to 7th Street is scheduled for 2023.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents